Skip to main content

At least 300 German road bridges to be replaced or refurbished by 2020

Germany intends to refurbish or replace at least 300 road bridges between now and 2020. It’s reported that this will result in costs of between US$ 4.81 billion (€3.60bn) and $8.92 billion (€6.7bn), based on 2010 prices. Many of the bridges affected are from the 1960s to 1980s and thought no longer suitable for the heavy transport traffic of today. Another claimed factor behind the necessity for the multi-billion dollar investment is that damage resulting from global warming was not taken into account when
January 23, 2013 Read time: 1 min
Germany intends to refurbish or replace at least 300 road bridges between now and 2020. It’s reported that this will result in costs of between US$ 4.81 billion (€3.60bn) and $8.92 billion (€6.7bn), based on 2010 prices. Many of the bridges affected are from the 1960s to 1980s and thought no longer suitable for the heavy transport traffic of today. Another claimed factor behind the necessity for the multi-billion dollar investment is that damage resulting from global warming was not taken into account when they were built.

Related Content

  • HDR’s twin Rockingham bridges win PCI award
    February 12, 2021
    The award from the Precast Concrete Institute is a third win for HDR projects.
  • Golden route to success
    July 20, 2012
    Built in 1937 and still the ninth longest suspension bridge in the world, the Golden Gate Bridge across San Francisco Bay remains in fine shape despite its age - Andrew Bardin Williams writes The Golden Gate Bridge turned 75 years old on May 27 and continues to play a key role in the transportation, engineering, construction and ITS communities. The structure has played an important historical role, an engineering success that boosted the economy of the region. And it also led the way as the first major pub
  • Florida replacing Howard Frankland Bridge
    August 22, 2018
    Florida Department of Transportation (FDOT) is working on plans to replace the Howard Franklin Bridge. The project is now expected to cost US$814 million, an increase from the $750 million originally envisaged. The contract is expected to be awarded in 2019, with construction commencing in 2020. The first stage of the project should be ready for use in 2024, providing a significant increase in daily capacity and boosting the emergency evacuation capacity also. The new bridge will carry four lanes of traffi
  • Sweden’s Tjörnbron Bridge to get replacement cables
    May 30, 2018
    SwedenSwedish contractor Svevia has been commissioned by the Swedish Transport Administration (Trafikverket) to handle cable replacements on the Tjörnbron Bridge. Replacement is expected to start in 2019 for completion by 2025. Svevia project manager Johan Söderberg said the work will be complicated, not least because traffic must continue to us the bridge. He reportedly said that much of the work will have to take place at night, in the summer and in good weather. The 664m-long cable stayed Tjörn Bridge,