Skip to main content

Leading Edge loader new at show

The latest addition to the Edge Design range of mobile handling equipment has been released at INTERMAT. The static (SL) / mobile (ML) / tracked (TL) vessel loader is capable of transferring up to 1,200tonnes per hour of material, and can accept it direct from large dumping trucks or tipping trailers. The Edge-Loader TL220 features a conventional belt design and large wide track mounted receiving hopper to facilitate loader filling. It can also be supplied with a discharge conveyor with full 180-degree radi
January 6, 2017 Read time: 2 mins
The Edge Design TL220 loader
RSSThe latest addition to the 5070 Edge Design range of mobile handling equipment has been released at INTERMAT.

The static (SL) / mobile (ML) / tracked (TL) vessel loader is capable of transferring up to 1,200tonnes per hour of material, and can accept it direct from large dumping trucks or tipping trailers.

The Edge-Loader TL220 features a conventional belt design and large wide track mounted receiving hopper to facilitate loader filling. It can also be supplied with a discharge conveyor with full 180-degree radial swing. The radial feature has left/right movement via internal hydraulic drives, allowing the operator to radial from any position, without stopping production.

Key advantages of the TL220 are fast set-up time on site and ease of transportation. It’s designed top handle multiple materials and can be used in a huge variety of applications, including discharging into ships, barges, train wagons, crushers and screens.

www.edgeinnovate.com

Hall: 3 Stand: B075

RSS
View more stories
View more videos

For more information on companies in this article

Related Content

  • Unic adds 10tonne lift model to its mini crane range
    April 17, 2012
    Unic Cranes Europe has added a 10tonne lift machine to its line-up. The URW-1006 offers a 30.7m lift height and a 24.3m working radius. However, at just 2m wide, the machine remains capable of accessing restricted working areas. The spider platform has configurable outriggers to provide greater stability when lifting on uneven surfaces. The crane also uses a Wylie i4500 safe load indicator to provide lifting information to the operator on a colour LCD screen.
  • Terex launches fully hydraulic self-erecting tower crane
    April 18, 2012
    Terex Cranes introduced the Eazy 90 fully-hydraulic self-erecting tower crane at INTERMAT. Equipped with a maximum 45m jib, the crane has a telescopic main tower with up to three additional mast sections. Erection can be carried out by two people in 2-4 hours depending on specification. The crane is equipped with safety lock-outs to ensure that each stage of erection has been completed before progressing to the next. A single operator is required to work the crane, with the Eazy 90 offering a maximum li
  • New mini inline bitumen emulsion plant from ENH Engineering
    April 19, 2013
    The ENH Engineering A/S bitumen emulsion plant is designed to meet with the high standards of modern emulsion technology. The inline system of this plant offers the possibility to produce all types of standard bitumen emulsion. The plant features a semi-automatic production control and has a production capacity of 2-4tonnes per hour. The inline system provides great flexibility in the production phase. The different flows for bitumen water and chemicals are controlled individually and can be changed during
  • New mini inline bitumen emulsion plant from ENH Engineering
    January 6, 2017
    The ENH Engineering A/S bitumen emulsion plant is designed to meet with the high standards of modern emulsion technology. The inline system of this plant offers the possibility to produce all types of standard bitumen emulsion. The plant features a semi-automatic production control and has a production capacity of 2-4tonnes per hour. The inline system provides great flexibility in the production phase. The different flows for bitumen water and chemicals are controlled individually and can be changed during