Skip to main content

Large companies show interest in Bosnia’s Corridor Vc motorway, says minister

Many large concessionaires have shown interest in the construction of the Corridor Vc motorway, according to Bosnian Minister of Transport and Telecoms, Damir Hadzic. When completed, the Bosnian section of the international Corridor Vc is planned to run for 330km through Bosnia and Herzegovina.
April 12, 2013 Read time: 1 min
Many large concessionaires have shown interest in the construction of the Corridor Vc motorway, according to Bosnian Minister of Transport and Telecoms, Damir Hadzic.

When completed, the Bosnian section of the international Corridor Vc is planned to run for 330km through Bosnia and Herzegovina.

Related Content

  • A major highway deal has been awarded by the Bosnian authorities
    May 25, 2012
    Construction work is now going ahead on the Suhodol-Tarcin section of Bosnia’s Corridor Vc highway. The Bosnian Government and highway company Autoceste FBiH Mostar signed a contract with Turkish company Cengiz Insaat Sanayi ve Ticaret for this section of the Corridor Vc highway. The deal is worth €115.2 million and will be for construction of a total of 5km of the motorway. The work is expected to take 28 months to complete. However a consortium of five construction companies from Bosnia and Herzegovina is
  • Breakthrough for Bosnia’s Vranduk Tunnel
    March 7, 2022
    The twin-tube Vranduk Tunnel is being built using the new Austrian tunnel method by Azerbaijan's Azvirt and Hering dd Siroki Brijeg contractors.
  • Bosnia gets EBRD loan for Corridor 5c work
    January 8, 2024
    The project will include the construction of an interchange and a 15 km dual-carriage motorway section, along the Mostar North-South section.
  • Preparations begin for Bosnia’s A1 motorway construction
    May 2, 2019
    Bosnian motorways company Autoceste Federacije says that preparations have started for construction of one of the most expensive parts of the A1 motorway. The project, costing around US$16 million per kilometre, will start on the 5.3km sub-road Vranduk-Pionirak – total value nearly $88.5 million. Work, which is being done by the consortium of Azerbaijani Azvirt and Bosnian Hering, includes a tunnel in central Bosnia./ The road is part of the pan European Corridor VC highway which runs from Budapesi