Skip to main content

Lafarge Volos sets up novel wastewater partnership

Lafarge's Volos cement plant in Greece has set up a novel partnership with a local drinks company, allowing it to reuse the company's wastewater in the cement producer’s industrial process. The Volos plant has connected its water network to that of the drinks company, using a nearby pipe previously used to pump water from a now disused bore hole to the plant. Now, waste water from the drinks company is piped directly to the Lafarge works, where it is used in the conditioning tower, before de-dusting
February 12, 2014 Read time: 2 mins
3180 Lafarge's Volos cement plant in Greece has set up a novel partnership with a local drinks company, allowing it to reuse the company's wastewater in the cement producer’s industrial process.

The Volos plant has connected its water network to that of the drinks company, using a nearby pipe previously used to pump water from a now disused bore hole to the plant.

Now, waste water from the drinks company is piped directly to the Lafarge works, where it is used in the conditioning tower, before de-dusting of gases from the plant's cement kiln.

“This solution provides our Volos plant with around 30,000m³ of water every year,” says Lafarge in a statement.

“This allows us to reduce freshwater consumption at Volos and provides an environmentally-sound solution for the reuse of this waste water, which was previously discharged directly into the sea.”

For more information on companies in this article

Related Content

  • New tunnel connection for Mexico
    November 8, 2017
    A major tunnel construction project has been carried out in Mexico, setting a technological precedent for Latin America . Mexican materials giant CEMEX took part in the construction of the Coatzacoalcos Underwater Tunnel in Veracruz, Mexico. This innovative project features large tunnel bores and utilised a complex construction process. As a result of these technical challenges CEMEX was required to design and deliver special concretes so as to allow the construction of the different structures needed to
  • Metso expand NW Rapid crusher line-up
    November 28, 2018
    Metso is introducing new higher capacity models to its popular wheel-mounted Metso NW Rapid series. In addition to the bigger jaw crusher model, the NW Rapid units are now also available with a variety of most robust cone crushers, including the first model with the MX crusher. Easily transportable using standard prime movers, over 1,000 NW Rapid models have already been sold. Planning a crushing and screening process can typically take months. Additionally, it's often difficult for aggregates producers
  • State-of-the art road tunnels in construction and use of ITS
    April 25, 2013
    A wealth of major road tunnel construction projects and significant cant ITS installations within existing key road tunnels have been recently completed or will soon be underway. Guy Woodford examines some of them. A state-of-the art Tunnel Boring Machine (TBM) - the 10th largest ever to be built worldwide will be put to work later this year on New Zealand Transport Agency’s landmark Waterview Connection project in Auckland. The giant Herrenknecht-manufactured machine will be used to construct the twin 2.5
  • Generac fights the dust
    May 17, 2021
    Generac Mobile says that its recently introduced compact Dust Fighter DF 4500 is between the mini models and the midi models.