Skip to main content

Lafarge picks up Vancouver runway deal

Lafarge Canada will be a subcontractor to Kiewit and in charge of asphalt paving for Vancouver International’s North Runway project.
By David Arminas January 24, 2025 Read time: 2 mins
Opened in 1996, the North Runway will receive a series of upgrades to enhance operational resiliency (image courtesy Lafarge Canada)

Lafarge Canada, a member of the Holcim Group, has been selected as the paving subcontractor for Vancouver International Airport’s North Runway Modernisation Programme.

Originally opened in 1996, the North Runway will receive a series of upgrades to enhance operational resiliency. The deal, estimated at around US$93 million, will upgrade the runway and improve drainage and electrical systems.

Vancouver Airport announced last October that it had chosen Kiewit to deliver paving and construction services. According to the airport administration, the 9941 foot North runway handles around 370 aircraft movements daily during peak times. The runway and connecting taxiways have around 230mm of asphalt overlay. Asphalt trucks will be timed to ensure optimal flow and noise management, meaning trucks will not come all at once or in close sequence, noted the airport administration.

Meanwhile, Tristar Electric will deliver lighting and electrical works. Around 1,500 LED lights will need to be raised during construction to match the new runway height.

DeltaTec, a Musqueam-owned and -operated business, was selected as a subcontractor to Tristar. Musqueam is one of Canada’s First Nation groups - original people of the land now known as Canada - whose traditional territory encompasses the western half of what is now Greater Vancouver, in the province of British Columbia.

Lafarge Canada, working in collaboration with Kiewit, will provide high-performance asphalt solutions that will resist heavy aircraft loads and diverse weather conditions. The North Runway Programme involves a full asphalt overlay of the runway and connecting taxiways, with construction scheduled to begin in the this spring and ending in the autumn. Work is planned to coincide with night time runway closures from 10pm to 7am in order to minimise disruptions to flights.

Lafarge Canada said it will use Environmental Product Declarations for all asphalt mixes - the first time Lafarge has implemented this in Canada. The declarations provide transparent verified data on the environmental impacts of the materials used.

"Lafarge is setting a benchmark in sustainability and durability by delivering infrastructure that not only meets the rigorous performance requirements of a world-class airport but also minimises its environmental impact,” said Lincoln Kyne, Lafarge Canada’s senior vice president for the Canadian province of British Columbia as well as the US Pacific Northwest region.

Additionally, to further reduce the project’s carbon footprint, Lafarge said it will use 10,000 tonnes of asphalt containing 30 percent recycled content for the runway shoulders. This will be done alongside energy-efficient production techniques and advanced asphalt formulations.

For more information on companies in this article

Related Content

  • Road recycling saves time and costs, reduces emissions
    February 13, 2012
    Stabilisers bring recycling improvements to roads in the UK and Armenia. The local road authorities near the UK city of Bath have saved nearly €250,500 on the cost of repairing a 400m long section of the B3110 Midford Road. This saving has been achieved by opting to recycle and strengthen in-situ the existing surface, instead of using conventional full depth pavement reconstruction.
  • Caterpillar pavers assist in Malta airport upgrade
    August 23, 2016
    A new Cat AP600F paver used by Maltese contractor Bonnici Brothers has helped with important resurfacing work at Malta’s International Airport. The machine was able to carry out the paving job within a tight time frame, due to its high productivity. The work was needed at the airport as part of a programme to increase its capacity. Malta is seeing growth in passenger numbers at the airport from both business travellers and tourists and there was a need to upgrade the facility. Local contractor Bonnic
  • Key expressway route through Hunter Valley
    November 11, 2013
    Australia’s Hunter Valley will benefit from a new high speed expressway, which is currently under construction - Simon Gould reports Located two hours north of Sydney, the Hunter Valley region in New South Wales is one of Australia’s largest producers of coal and wine. With international demand, particularly from Asia, for both continuing to increase, a significant upgrade of infrastructure was required between the region and the port of Newcastle, the world’s largest coal export port. However the strict en
  • Cost effective road maintenance
    February 8, 2012
    Highway maintenance and repair is an easy target for cuts in highway budgets, but there are cost-effective measures that can be adopted as Patrick Smith reports. Road maintenance is an increasingly important industry that spans a worldwide market. Awareness of the need for a stable and sustainable international infrastructure, maintenance and creative rural road technologies are taking a stronger role as viable sources for a cost-effective means of preserving, developing and prolonging the life of roads wit