Skip to main content

Lafarge picks up Vancouver runway deal

Lafarge Canada will be a subcontractor to Kiewit and in charge of asphalt paving for Vancouver International’s North Runway project.
By David Arminas January 24, 2025 Read time: 2 mins
Opened in 1996, the North Runway will receive a series of upgrades to enhance operational resiliency (image courtesy Lafarge Canada)

Lafarge Canada, a member of the Holcim Group, has been selected as the paving subcontractor for Vancouver International Airport’s North Runway Modernisation Programme.

Originally opened in 1996, the North Runway will receive a series of upgrades to enhance operational resiliency. The deal, estimated at around US$93 million, will upgrade the runway and improve drainage and electrical systems.

Vancouver Airport announced last October that it had chosen Kiewit to deliver paving and construction services. According to the airport administration, the 9941 foot North runway handles around 370 aircraft movements daily during peak times. The runway and connecting taxiways have around 230mm of asphalt overlay. Asphalt trucks will be timed to ensure optimal flow and noise management, meaning trucks will not come all at once or in close sequence, noted the airport administration.

Meanwhile, Tristar Electric will deliver lighting and electrical works. Around 1,500 LED lights will need to be raised during construction to match the new runway height.

DeltaTec, a Musqueam-owned and -operated business, was selected as a subcontractor to Tristar. Musqueam is one of Canada’s First Nation groups - original people of the land now known as Canada - whose traditional territory encompasses the western half of what is now Greater Vancouver, in the province of British Columbia.

Lafarge Canada, working in collaboration with Kiewit, will provide high-performance asphalt solutions that will resist heavy aircraft loads and diverse weather conditions. The North Runway Programme involves a full asphalt overlay of the runway and connecting taxiways, with construction scheduled to begin in the this spring and ending in the autumn. Work is planned to coincide with night time runway closures from 10pm to 7am in order to minimise disruptions to flights.

Lafarge Canada said it will use Environmental Product Declarations for all asphalt mixes - the first time Lafarge has implemented this in Canada. The declarations provide transparent verified data on the environmental impacts of the materials used.

"Lafarge is setting a benchmark in sustainability and durability by delivering infrastructure that not only meets the rigorous performance requirements of a world-class airport but also minimises its environmental impact,” said Lincoln Kyne, Lafarge Canada’s senior vice president for the Canadian province of British Columbia as well as the US Pacific Northwest region.

Additionally, to further reduce the project’s carbon footprint, Lafarge said it will use 10,000 tonnes of asphalt containing 30 percent recycled content for the runway shoulders. This will be done alongside energy-efficient production techniques and advanced asphalt formulations.

For more information on companies in this article

Related Content

  • The A14 Cambridge to Huntingdon improvement scheme takes shape
    May 31, 2017
    Highways England’s project manager gives sneak peek into progress on the UK’s biggest road upgrade now under construction. Road construction workers often find interesting buried items when building roads and the UK’s A14 Cambridge to Huntingdon improvement scheme is proving the point. It’s been less than half a year since construction started on the €1.76 billion A14 scheme, Highways England’s largest ongoing project. Highways England is the wholly government-owned company responsible for modernising, main
  • Haast-Hollyford, NZ toll road to provide 1,500 construction jobs
    March 31, 2014
    The US$197.79 million (NZD 230 million) Haast-Hollyford toll road in New Zealand is expected to provide 1,500 construction jobs over four years, increase West Coast tourism and cut travel time between Haast and Milford Sound. Extra funding for the toll road has been made available. The toll fee will begin at $30.26 (NZD 35) per traveller and will generate $25.93 million (NZD 30 million) in the first year.
  • Road and airport deal for Bolivia
    February 27, 2012
    A World Bank loan worth US$109 million is paying for an upgrade to the road connecting the Bolivian conurbations of Rurrenabaque and Ixiamas as well as to the airport in Rurrenabaque.
  • Competitive asphalt compaction market
    February 13, 2012
    Existing tough competition will step up another gear with the launch of further new machines in the asphalt roller market, Mike Woof reports. The asphalt compaction equipment market is intensely competitive, with a number of major firms all fighting to boost market share. And with many major manufacturers having revamped ranges during 2010 and further new models now due, this rivalry is set to become tougher still.