Skip to main content

Kosovo's highway and bridge construction on target

In Kosovo, work is pushing ahead of schedule on the Route 7 highway to link capital Pristina with the Albanian border. Sections of the 120km highway have been opened, one year ahead of schedule. An official opening of several sections of the highway has been carried out by Kosovan leaders, including Prime Minister Hashim Thaçi, President Atifete Jahjaga, and members of Parliament, along with Albanian Prime Minister Sali Berisha and US representatives Eliot Engel (D- NY) and Gary Peters (D-MI) joined thousan
May 4, 2012 Read time: 2 mins
The bridges for Kosovo's Route 7 Highway are being built along modular lines with standardised 40m pre-cast concrete beams being installed over the top of the piers
In Kosovo, work is pushing ahead of schedule on the Route 7 highway to link capital Pristina with the Albanian border.

Sections of the 120km highway have been opened, one year ahead of schedule. An official opening of several sections of the highway has been carried out by Kosovan leaders, including Prime Minister Hashim Thaçi, President Atifete Jahjaga, and members of Parliament, along with Albanian Prime Minister Sali Berisha and US representatives Eliot Engel (D- NY) and Gary Peters (D-MI) joined thousands of Kosovans to celebrate at an opening ceremony.

The project is being carried out by US/Turkish joint venture partners 4138 Bechtel and 5252 Enka, with construction having commenced in the second quarter of 2010. Funding for the project has come from the Kosovan Government itself and route optimisation work by Bechtel-Enka managed to avoid the need for boring twin tube tunnels to the south east of Pristina.

Instead the main Route 7 highway joins with the M9 dual carriageway to the south west of the city, which was built recently by a local contractor. This modified route reduced construction costs for the Route 7 project considerably, a major factor in Bechtel-Enka winning the contract.

The motorway is scheduled for completion in 2013. A full report on this project will be published in the Jan/Feb issue of World Highways.

For more information on companies in this article

Related Content

  • Indeco hammers carry out key excavation work in Italian tunnel project
    December 2, 2014
    Indeco breakers have been instrumental in excavating the Serra Rotonda Tunnel along the new Salerno-Reggio Calabria highway in southern Italy - Lucio Garofalo reports The A3 Salerno-Reggio-Calabria highway runs for some 443km, linking the A1 Milano-Napoli with the southernmost part of the country. A tunnel is a major link on this highway and was originally built between 1966 and 1974 in an area where road construction can be a challenge due to orography, geology and seismicity. Since 2001, the A3 has bee
  • Bulgaria plans for operating road infrastructure
    February 21, 2012
    There is a lot of work to do on Bulgarian roads, but the government has plans to increase the length of highways built each year as Krasimir Krastanov reports. Bulgarian roads with a pavement make up 98.4% of all the country's roads, while 92.5% of them have an asphalt surface and 82.8% of them are able to carry 10tonnes/axle.
  • Highway 99 revisited
    March 6, 2024
    David Arminas recently returned to Seattle for an inside look at some of the features of the now-complete SR99 tunnel that was a World Highways key project report in November 2017.
  • Germany builds its first major PPI autobahn project
    July 7, 2015
    Rebuilding of one of the oldest motorways in Germany is testing out the possibilities for public-private project road construction reports Adrian Greeman A freshly renovated section of the A8 Autobahn in southern Germany will be watched with some interest this summer as traffic begins driving along its rebuilt carriageway and additional third lanes. That is not because of any special road features, other than a distinctive reddish colour to its concrete surface, but because it is a first fullscale public