Skip to main content

Komatsu adds compact tailswing 14tonne excavator

Komatsu’s new PC138US-10 short-tailswing hydraulic excavator has an operating weight between 13,400 and 14,467kg, comes with a 69.7kW Stage 3B/Tier 4I-compliant engine and has improved hydraulic efficiency and operator comfort. The PC138US-10 is supported by the Komatsu CARE complimentary three-year/2,000hr maintenance programme. The company said lift capacity and stability of the compact machine are comparable to a conventional excavator, while the contoured cab swings within the same radius as the count
January 6, 2017 Read time: 2 mins
Compact offering form Komatsu
2300 Komatsu’s new PC138US-10 short-tailswing hydraulic excavator has an operating weight between 13,400 and 14,467kg, comes with a 69.7kW Stage 3B/Tier 4I-compliant engine and has improved hydraulic efficiency and operator comfort.

The PC138US-10 is supported by the Komatsu CARE complimentary three-year/2,000hr maintenance programme.

The company said lift capacity and stability of the compact machine are comparable to a conventional excavator, while the contoured cab swings within the same radius as the counterweight.

At the front end the work equipment is designed to minimise the front swing radius for better operation in confined areas. The new contoured ROPS cab has a sliding door and is mounted on viscous damper mounts to reduce vibration. The operator can select from six working modes.

To ease maintenance there is an access handrail on the upper structure. The radiator and hydraulic oil cooler are mounted side-by-side and wide access service doors facilitate daily service checks.

Stand: B5 104

%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 12728 0 oLinkExternal www.komatsu.eu www.komatsu.eu false /EasySiteWeb/GatewayLink.aspx?alId=12728 false false%>

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Komatsu

Related Content

  • Hidromek is developing wheeled loaders
    February 6, 2013
    Hidromek is commencing work on developing its new wheeled loader line. Export manager Anil Bingöl said, “We have started our wheeled loader project and we hope to have our first prototype machine this year.” This will feature a 3m3 bucket and will be the first in a range of wheeled loaders from the firm. Machines with bucket capacities of 4m3 and then 5m3 will be developed in due course. Testing of the first prototype will be carried out in Turkey and Bingöl said the firm intends to have its wheeled loaders
  • Five things road construction crews should not do
    June 19, 2015
    Sometimes you need a sense of humour to complete a task. Sometimes that sense of humour can overstep the mark and not everyone will see the joke, as these five road construction site pictures show. Here are five things that construction crews should not do.
  • Wirtgen develops novel cutter wear system
    January 6, 2017
    Wirtgen’s novel inspection system offers a quick indication of wear rates on the cutting tools of the firm’s surface miners. Called the Wirtgen Pick Inspection (WPI) system, this tool comprises eight sensors that can make fast measurements and which are integrated into the cutting drum compartment of the surface miner. The sensors measure the degree of wear of the picks and the measuring process takes just one minute to complete, allowing it to carried out while changing trucks and reducing downtimes. The W
  • Wirtgen develops novel cutter wear system
    February 13, 2013
    Wirtgen’s novel inspection system offers a quick indication of wear rates on the cutting tools of the firm’s surface miners. Called the Wirtgen Pick Inspection (WPI) system, this tool comprises eight sensors that can make fast measurements and which are integrated into the cutting drum compartment of the surface miner. The sensors measure the degree of wear of the picks and the measuring process takes just one minute to complete, allowing it to carried out while changing trucks and reducing downtimes. The W