Skip to main content

Kohler prepares dealer network for emissions regulations

Kohler Engines is preparing its dealer network for further emissions regulation with increased training, including the use of its iService multimedia platform. The company offers service training courses throughout its network, in branches, distributors and authorised workshops. In addition it is offering distance learning through the iService portal. This combines the traditional viewing of service manuals with interactive content including 3D movies. This can be accessed on computers, tablets and smartpho
February 5, 2016 Read time: 1 min
Kohler: training on emissions regulations
2278 Kohler Engines is preparing its dealer network for further emissions regulation with increased training, including the use of its iService multimedia platform. The company offers service training courses throughout its network, in branches, distributors and authorised workshops. In addition it is offering distance learning through the iService portal. This combines the traditional viewing of service manuals with interactive content including 3D movies. This can be accessed on computers, tablets and smartphones.

For more information on companies in this article

Related Content

  • Cifa equipment is pressed into service for Venice’s Mose project
    November 25, 2015
    The Mose project is a vast intervention plan by Italy’s Ministry of Infrastructure and Transport to protect Venice from flooding. It also has presented Cifa and its partners a big challenge for pumping concrete over a long distance. The work, being carried out by the Venezia Nuova Consortium, consisting of national and local construction and engineering companies, includes four mobile barriers consisting of 78 gates at the lagoon’s inlets. Most of the time the barriers will be resting on the seabed and not
  • Cifa equipment is pressed into service for Venice’s Mose project
    November 25, 2015
    The Mose project is a vast intervention plan by Italy’s Ministry of Infrastructure and Transport to protect Venice from flooding. It also has presented Cifa and its partners a big challenge for pumping concrete over a long distance. The work, being carried out by the Venezia Nuova Consortium, consisting of national and local construction and engineering companies, includes four mobile barriers consisting of 78 gates at the lagoon’s inlets. Most of the time the barriers will be resting on the seabed and not
  • A new construction ICON
    January 3, 2013
    More efficient construction operations should be the benefit of the new technology from Leica Geosystems. The firm is introducing its latest Leica iCON telematics package, which is said to offer increased efficiency for machine control operations on site and remote machinery fleet management. The Leica iCON telematics package is a web-based suite of tools that allows contractors to increase the efficiency of machine control operations on site and manage machinery fleets. This is a key component in iCONnect,
  • A new construction ICON
    January 3, 2013
    More efficient construction operations should be the benefit of the new technology from Leica Geosystems. The firm is introducing its latest Leica iCON telematics package, which is said to offer increased efficiency for machine control operations on site and remote machinery fleet management. The Leica iCON telematics package is a web-based suite of tools that allows contractors to increase the efficiency of machine control operations on site and manage machinery fleets. This is a key component in iCONnect,