Skip to main content

Kier picks up London tunnel deal

The eight-year maintenance contract includes the Blackwall and Rotherhithe tunnels.
By David Arminas February 1, 2021 Read time: 2 mins
The 1.3km Blackwall Tunnel was originally opened as a single bore in 1897 (photo © Burnstuff2003/Dreamstime)

Kier Highways has won a contract to maintain and manage London’s 10 road tunnels and associated 106 road pumping stations.

The contract with Transport for London (TfL) is worth around €226 million (£200million/US$275 million) over eight years and starts in April, with the option to extend by a further four years.

It includes mechanical, electrical and control activities associated with each tunnel, renewals, safety inspections, intelligent transport systems and cleaning.

The tunnels under the new contract include Blackwall, Rotherhithe, Green Man, George Green, Eastway, Upper Thames Street, Eltham, Fore Street and Hangar Lane.

This will make management of all of TfL's tunnels in London more efficient and make it quicker and easier for TfL to introduce new technology and best practice into the area, said Joe Incutti, group managing director at Kier Highways.

The 1.5km single bore Rotherhithe tunnel was opened in 1908. It carries  a two-lane carriageway 15m below the high-water level of the Thames, with a maximum depth of 23m below the surface.

The 1.3km Blackwall Tunnel was originally opened was a single bore in 1897. By the 1930s, capacity was becoming inadequate and a second bore as opened in 1967.

Kier is already working with TfL to maintain the capital city agency’s main roads with carry around 30 per cent of city traffic. Kier Highways said that the company now maintains 15 tunnels across the UK with a combined bore length of more than 10km.

 

For more information on companies in this article

Related Content

  • British Columbia decides on Massey Tunnel
    August 20, 2021
    Canada’s Pacific coast province of British Columbia has announced the George Massey Tunnel replacement will be another tunnel and not a bridge as decided earlier.
  • State-of-the art road tunnels in construction and use of ITS
    April 25, 2013
    A wealth of major road tunnel construction projects and significant cant ITS installations within existing key road tunnels have been recently completed or will soon be underway. Guy Woodford examines some of them. A state-of-the art Tunnel Boring Machine (TBM) - the 10th largest ever to be built worldwide will be put to work later this year on New Zealand Transport Agency’s landmark Waterview Connection project in Auckland. The giant Herrenknecht-manufactured machine will be used to construct the twin 2.5
  • ASECAP: maintenance mindshift turns spending into investment
    August 4, 2017
    With an estimated value of €8 trillion, the road infrastructure is probably the European Union’s largest single asset. It accounts for 83% of passenger journeys and more than 70% of freight movement. Despite this importance, global investment in roads - especially maintenance - has fallen, said Christophe Nicodeme, European Road Federation secretary general. There are grave consequences, noted Nicodeme in his opening keynote address to the recent Study and Information Days gathering, an annual event for mem
  • More tenders for Lower Thames Crossing
    April 1, 2021
    The winners will build 23km of road connecting to the UK’s longest road tunnel.