Skip to main content

Kier picks up London tunnel deal

The eight-year maintenance contract includes the Blackwall and Rotherhithe tunnels.
By David Arminas February 1, 2021 Read time: 2 mins
The 1.3km Blackwall Tunnel was originally opened as a single bore in 1897 (photo © Burnstuff2003/Dreamstime)

Kier Highways has won a contract to maintain and manage London’s 10 road tunnels and associated 106 road pumping stations.

The contract with Transport for London (TfL) is worth around €226 million (£200million/US$275 million) over eight years and starts in April, with the option to extend by a further four years.

It includes mechanical, electrical and control activities associated with each tunnel, renewals, safety inspections, intelligent transport systems and cleaning.

The tunnels under the new contract include Blackwall, Rotherhithe, Green Man, George Green, Eastway, Upper Thames Street, Eltham, Fore Street and Hangar Lane.

This will make management of all of TfL's tunnels in London more efficient and make it quicker and easier for TfL to introduce new technology and best practice into the area, said Joe Incutti, group managing director at Kier Highways.

The 1.5km single bore Rotherhithe tunnel was opened in 1908. It carries  a two-lane carriageway 15m below the high-water level of the Thames, with a maximum depth of 23m below the surface.

The 1.3km Blackwall Tunnel was originally opened was a single bore in 1897. By the 1930s, capacity was becoming inadequate and a second bore as opened in 1967.

Kier is already working with TfL to maintain the capital city agency’s main roads with carry around 30 per cent of city traffic. Kier Highways said that the company now maintains 15 tunnels across the UK with a combined bore length of more than 10km.

 

For more information on companies in this article

Related Content

  • Aecon sells Ontario road business to GIP
    May 18, 2023
    Canadian infrastructure group Aecon has sold its Ontario-based construction and aggregates business Aecon Transportation East to Green Infrastructure Partners.
  • Highways England tests ghost busters
    January 22, 2021
    Skid resistance and removal for marking products are being analysed.
  • London’s Westminster Council goes for gully offenders
    February 8, 2018
    Increasing numbers of blocked road drains and gullies has forced London’s Westminster City Council to take a tough stand with offenders The council maintains 16,500 gullies. Around 95% of a gully’s content is natural and can be recycled: taken away to road contractor FM Conway’s drainage treatment plant. Material is separated into solids, organics and water and reused as aggregates and materials in their wider construction business.
  • Tunnel breakthrough for new Auckland link in New Zealand
    October 8, 2014
    Auckland’s Western Ring Route project update - Mary Bell writes. A number of integrated projects in Auckland, New Zealand, will improve the lot of road users and cyclists, and significantly alter the topography of the city’s motorway. On September 29th the tunnel boring machine digging the first of twin road tunnels beneath the city broke into daylight after 10 months underground. The new 2.4km-long Waterview tunnels will connect the city’s Northwestern and Southwestern motorways, each carrying three lane