Skip to main content

Kier picks up London tunnel deal

The eight-year maintenance contract includes the Blackwall and Rotherhithe tunnels.
By David Arminas February 1, 2021 Read time: 2 mins
The 1.3km Blackwall Tunnel was originally opened as a single bore in 1897 (photo © Burnstuff2003/Dreamstime)

Kier Highways has won a contract to maintain and manage London’s 10 road tunnels and associated 106 road pumping stations.

The contract with Transport for London (TfL) is worth around €226 million (£200million/US$275 million) over eight years and starts in April, with the option to extend by a further four years.

It includes mechanical, electrical and control activities associated with each tunnel, renewals, safety inspections, intelligent transport systems and cleaning.

The tunnels under the new contract include Blackwall, Rotherhithe, Green Man, George Green, Eastway, Upper Thames Street, Eltham, Fore Street and Hangar Lane.

This will make management of all of TfL's tunnels in London more efficient and make it quicker and easier for TfL to introduce new technology and best practice into the area, said Joe Incutti, group managing director at Kier Highways.

The 1.5km single bore Rotherhithe tunnel was opened in 1908. It carries  a two-lane carriageway 15m below the high-water level of the Thames, with a maximum depth of 23m below the surface.

The 1.3km Blackwall Tunnel was originally opened was a single bore in 1897. By the 1930s, capacity was becoming inadequate and a second bore as opened in 1967.

Kier is already working with TfL to maintain the capital city agency’s main roads with carry around 30 per cent of city traffic. Kier Highways said that the company now maintains 15 tunnels across the UK with a combined bore length of more than 10km.

 

For more information on companies in this article

Related Content

  • Bridge engineering worldwide
    July 1, 2013
    Guy Woodford looks at vital bridge construction, repair and inspection projects in China, Europe, North America and Australia The Heron Road Bridge in Ottawa, Ontario in Canada is a vital link within the City’s transport network, as it crosses the Rideau River, which divides the east and west parts of the City. Constructed in 1966-1967, the Heron Road Bridge is approximately 275m long and includes six lanes.
  • Giving four hours back to the day… and much more
    October 7, 2019
    A 20km long elevated expressway in Dhaka will be one of Bangladesh’s first Public Private Partnership transport projects – words and pictures by Ruby Kitching, on behalf of Mott MacDonald.
  • Tunnels eliminate bottlenecks
    February 10, 2012
    Some of the bottlenecks on the multi-lane Mittlere Ring, Munich, Germany, one of the main arterial roads circling the city centre have been eliminated by the addition of new tunnels. The Luise-Kiesselbach Square, the last section of this road improvement effort, is an important traffic hub south-west of the city where motorways A96 from Lindau and A5 from Garmisch meet, causing long delays in daily rush-hour traffic, writes Patrick Smith.
  • US$690 million for Indonesia toll tunnel
    September 3, 2024
    Funding worth US$690 million is planned for Indonesia’s toll tunnel.