Skip to main content

Kier picks up London tunnel deal

The eight-year maintenance contract includes the Blackwall and Rotherhithe tunnels.
By David Arminas February 1, 2021 Read time: 2 mins
The 1.3km Blackwall Tunnel was originally opened as a single bore in 1897 (photo © Burnstuff2003/Dreamstime)

Kier Highways has won a contract to maintain and manage London’s 10 road tunnels and associated 106 road pumping stations.

The contract with Transport for London (TfL) is worth around €226 million (£200million/US$275 million) over eight years and starts in April, with the option to extend by a further four years.

It includes mechanical, electrical and control activities associated with each tunnel, renewals, safety inspections, intelligent transport systems and cleaning.

The tunnels under the new contract include Blackwall, Rotherhithe, Green Man, George Green, Eastway, Upper Thames Street, Eltham, Fore Street and Hangar Lane.

This will make management of all of TfL's tunnels in London more efficient and make it quicker and easier for TfL to introduce new technology and best practice into the area, said Joe Incutti, group managing director at Kier Highways.

The 1.5km single bore Rotherhithe tunnel was opened in 1908. It carries  a two-lane carriageway 15m below the high-water level of the Thames, with a maximum depth of 23m below the surface.

The 1.3km Blackwall Tunnel was originally opened was a single bore in 1897. By the 1930s, capacity was becoming inadequate and a second bore as opened in 1967.

Kier is already working with TfL to maintain the capital city agency’s main roads with carry around 30 per cent of city traffic. Kier Highways said that the company now maintains 15 tunnels across the UK with a combined bore length of more than 10km.

 

For more information on companies in this article

Related Content

  • Importance of road/tunnel drainage systems
    May 8, 2012
    A variety of systems are available for quickly and efficiently removing water from roads as Patrick Smith reports. The presence of water in a highway layer reduces the bearing capacity of the road, and in doing so it also reduces the structure's lifetime. Indeed, the recent extremely cold winter in many parts of Europe has shown that in colder climates there is a risk of frost damage when water is present resulting in costly potholes, so drainage systems performing properly are important in road design.
  • Tajikistan tunnel construction work
    April 17, 2020
    Work is resuming on the Istiqlol Tunnel in Tajikistan.
  • Bulgaria signs Shipka Pass deal
    June 17, 2022
    The PSVT consortium picked up the Shipka Pass Tunnel project as part of the bypass for Gabrovo City, a town of around 50,000 situated on the Yantra River.
  • Amey secures ITS deal with Transport Scotland
    January 3, 2022
    Amey will operate and maintain variable messaging signs, CCTV, emergency roadside telephones and various power and communication cabinets.