Skip to main content

Kier picks up London tunnel deal

The eight-year maintenance contract includes the Blackwall and Rotherhithe tunnels.
By David Arminas February 1, 2021 Read time: 2 mins
The 1.3km Blackwall Tunnel was originally opened as a single bore in 1897 (photo © Burnstuff2003/Dreamstime)

Kier Highways has won a contract to maintain and manage London’s 10 road tunnels and associated 106 road pumping stations.

The contract with Transport for London (TfL) is worth around €226 million (£200million/US$275 million) over eight years and starts in April, with the option to extend by a further four years.

It includes mechanical, electrical and control activities associated with each tunnel, renewals, safety inspections, intelligent transport systems and cleaning.

The tunnels under the new contract include Blackwall, Rotherhithe, Green Man, George Green, Eastway, Upper Thames Street, Eltham, Fore Street and Hangar Lane.

This will make management of all of TfL's tunnels in London more efficient and make it quicker and easier for TfL to introduce new technology and best practice into the area, said Joe Incutti, group managing director at Kier Highways.

The 1.5km single bore Rotherhithe tunnel was opened in 1908. It carries  a two-lane carriageway 15m below the high-water level of the Thames, with a maximum depth of 23m below the surface.

The 1.3km Blackwall Tunnel was originally opened was a single bore in 1897. By the 1930s, capacity was becoming inadequate and a second bore as opened in 1967.

Kier is already working with TfL to maintain the capital city agency’s main roads with carry around 30 per cent of city traffic. Kier Highways said that the company now maintains 15 tunnels across the UK with a combined bore length of more than 10km.

 

For more information on companies in this article

Related Content

  • Bangladesh, China seal $705 million deal for Karnaphuli River tunnel
    July 2, 2015
    Bangladesh has formally signed a US$705 million deal with China Communication Construction to build a multi-lane road tunnel underneath the Karnaphuli River in Chittagong. Road Transport and Bridges secretary Man Siddique along with the government’s Road Transport and Bridges minister Obaidul Quader signed the contract with Liu Qitao, chairman of China Communication Construction. The signing took place in Beijing, according to a report in the Bangladesh newspaper The Independent.
  • Province halts planned Vancouver bridge to replace Massey Tunnel
    September 14, 2017
    Canada’s province of British Columbia has stopped procurement for a proposed 10-lane US$2.8 billion bridge to replace the ageing George Massey Tunnel near Vancouver. Local media said the province would pay $1.65 million to two of the three shortlisted consortia which had already submitted bids for what is officially called the George Massey Tunnel Replacement project.
  • Province halts planned Vancouver bridge to replace Massey Tunnel
    September 14, 2017
    Canada’s province of British Columbia has stopped procurement for a proposed 10-lane US$2.8 billion bridge to replace the ageing George Massey Tunnel near Vancouver. Local media said the province would pay $1.65 million to two of the three shortlisted consortia which had already submitted bids for what is officially called the George Massey Tunnel Replacement project.
  • FM Conway and TfL set “benchmark” for RAP use in A40 project
    November 30, 2017
    Infrastructure services company FM Conway and the UK’s Transport for London (TfL) have set “a new benchmark” for recycling in the highways industry.