Skip to main content

KGM to build 2,000km of new roads in Turkey

The Turkish General Directorate of Motorways (KGM) aims to build over 2,000km of roads in 2013. They will consist of 998km single-platform roads and 1070.5km of dual carriageway. Out of the total duel carriageway, 20.5km will be added to motorways and 1,050km to state roads. Almost 20,000km roads will be asphalt covered or repaired. KGM currently manages 63,250km state roads and 2,250km of motorways in Turkey. It plans to build a total of 9,700km dual carriageway and 5,550km motorways by 2023.
April 26, 2013 Read time: 1 min
The Turkish General Directorate of Motorways (3337 KGM) aims to build over 2,000km of roads in 2013. They will consist of 998km single-platform roads and 1070.5km of dual carriageway. Out of the total duel carriageway, 20.5km will be added to motorways and 1,050km to state roads. Almost 20,000km roads will be asphalt covered or repaired.

KGM currently manages 63,250km state roads and 2,250km of motorways in Turkey. It plans to build a total of 9,700km dual carriageway and 5,550km motorways by 2023.

For more information on companies in this article

Related Content

  • Warm mix use in the US and Czech Republic is strong
    May 20, 2014
    The Czech Republic has seen its first ever use of warm mix produced using additive Evotherm - and a survey carried out in the US shows that warm mix is still on the rise there - Kristina Smith reports The troubled Blanka Tunnel in Prague will see the Czech Republic’s first ever use of Evotherm warm mix asphalt (WMA) technology. The 6km tunnel is the longest urban motorway tunnel in Europe and will take the north-west section of the city ring road below ground. Designed as dual carriageway throughout w
  • BOMAG: road construction with warm mix asphalt
    July 3, 2024
    When it comes to paving and compacting warm mix asphalt (WMA), BOMAG rollers and pavers really come into their own. Well prepared for what’s to come: road construction with warm mix asphalt.
  • Turkey to tender for Izmir-Candarli beltway contract
    November 15, 2016
    Turkish highway authorities will tender construction of the remaining part the Izmir-Menemen-Aliaga-Candarli motorway on 15 February. The contract will be build-operate-transfer for the 76km section between the towns of Aliaga and Candarli. Constructions is expected to take three years. The 16km section between Izmir and Menemen is already finished, according to Turkish media. Up to 60,000 vehicles a day are projected to use the highway from Izmir to Candarli. It is officially called the Otoyol 30
  • A new highway is planned connecting Turkey with Romania through Bulgaria
    May 24, 2012
    Discussions are now underway on a new highway to connect Turkey with Romania. A major stretch of this new highway will run through Bulgaria, which will provide a much-needed link in the country as it has insufficient express road infrastructure at present. The Bulgarian section of the highway would run from Ruse to Svilengrad. The political leaders of Bulgaria and Turkey, as well as Qatar, have been in discussions over the proposed project