Skip to main content

KGM to build 2,000km of new roads in Turkey

The Turkish General Directorate of Motorways (KGM) aims to build over 2,000km of roads in 2013. They will consist of 998km single-platform roads and 1070.5km of dual carriageway. Out of the total duel carriageway, 20.5km will be added to motorways and 1,050km to state roads. Almost 20,000km roads will be asphalt covered or repaired. KGM currently manages 63,250km state roads and 2,250km of motorways in Turkey. It plans to build a total of 9,700km dual carriageway and 5,550km motorways by 2023.
April 26, 2013 Read time: 1 min
The Turkish General Directorate of Motorways (3337 KGM) aims to build over 2,000km of roads in 2013. They will consist of 998km single-platform roads and 1070.5km of dual carriageway. Out of the total duel carriageway, 20.5km will be added to motorways and 1,050km to state roads. Almost 20,000km roads will be asphalt covered or repaired.

KGM currently manages 63,250km state roads and 2,250km of motorways in Turkey. It plans to build a total of 9,700km dual carriageway and 5,550km motorways by 2023.

For more information on companies in this article

Related Content

  • Major producer of road construction materials
    February 10, 2012
    The Simge Group operates a massive and highly modern quarrying operation close to the Turkish city of Bursan, which provides a major supply of aggregates and asphalt to the country's highway construction sector. This quarry produces around 4 million tonnes/year of crushed limestone and is the largest of the five quarries the Simge Group runs in Turkey, which have a combined output of 12 million tonnes/year. The huge site has an asphalt output of 500,000tonnes/year, again a significant portion of the 1.2 mil
  • Set the ALARM for repairs in England and Wales
    January 10, 2019
    More than 3,900km of roads in England and Wales will need essential maintenance within the next year, according to the annual ALARM survey* Cash-strapped local governments are reporting that the gap between the funds they received and the amount they needed for repairs and maintenance was almost €639 million. This equated to an average shortfall of €3.75 million for every authority. It would take 14 years to get local roads back into a reasonable steady state, but only if adequate funds and resources wer
  • Liebherr achieves record turnover in 2012
    April 10, 2013
    The Liebherr Group achieved its highest turnover in its history in 2012. Turnover climbed over than 9% to €9.1 billion, while the company invested a total of €840 million in its operations. The 2012 business year progressed well for the Liebherr Group. Although the reduced dynamism of the world economy had a noticeable effect on orders received in the final months of the year, this no longer influenced turnover significantly. The Group increased its total turnover in the past business year by more than €760
  • Building the diamond road in Lesotho
    April 6, 2016
    A job site in the Southern African nation of Lesotho represents one of the most extreme and challenging projects to some key Italian firms of the last 10 years. The project was certainly different from the norm It involves building a road in the Lesotho Mountains, some 200km from the capital Maseru, with the work being carried out by the Cooperative of Building and Cement workers from Ravenna (CMC). CMC, which has ranked among Marini's clients for many years now, is involved in the construction of a