Skip to main content

Key Russian highway to be reconstructed

The tender process is now open for work to rebuild a key highway connection linking St Petersburg with Murmansk in Russia. Kola state enterprise is managing the tender process. The section of the highway in question runs from St Petersburg to Petrozavodsk via Priozersk and Sortavala. The work is expected to cost some US$182.6 million and to require up to 1,262 days to carry out. The tender result will be revealed on 13 May 2013.
April 12, 2013 Read time: 1 min
The tender process is now open for work to rebuild a key highway connection linking St Petersburg with Murmansk in Russia. Kola state enterprise is managing the tender process. The section of the highway in question runs from St Petersburg to Petrozavodsk via Priozersk and Sortavala. The work is expected to cost some US$182.6 million and to require up to 1,262 days to carry out. The tender result will be revealed on 13 May 2013.

Related Content

  • Russian road deals
    February 24, 2012
    A notable partnership deal looks set to provide funding for key Russian highway projects. A memorandum of co-operation has been signed between the state-owned Russian Highways (Avtodor) and the European Bank for Reconstruction and Development (EBRD).
  • Controversial Russian bridge opens
    August 10, 2018
    The first stage of a controversial Russian bridge project is now complete, with the link having been opened to use by cars and buses. The Kerch Strait bridge spans the Black Sea, connecting Russia’s Taman Peninsula in Krasnodar with Crimea, the latter having been controversially annexed by Russia from Ukraine in 2014. The official opening of the 19km-long bridge was carried out by Russia’s president, Vladimir Putin, who drove across the link in a Russian-manufactured Kamaz truck to reach the city of Kerch.
  • Tender offer for Moscow – St Petersburg highway
    November 1, 2012
    Bidding is strong for work on a key section of the Moscow to St Petersburg highway. Several offers have been made for the project, which will connect the Businovskaya and MKAD junction to Festivalnaya Street, and a junction of Festivalnaya Street and MKAD. Both Mostotrest and ARKS are tendering for the work. The tender results will be announced on 20th November 2012. The authorities have stated that the contract price should not exceed US$946 million.
  • BOMAG’s smart asphalt compaction technology in use
    May 25, 2016
    BOMAG’s highly sophisticated compaction control technology is now being used successfully on the highway project to link Warsaw with St Petersburg. The system is being employed in the rural area around the border triangle of Lithuania, Latvia and Belarus. Lithuanian road contractor Panevezio Keliai won the package of works to upgrade a stretch of the E262 in Zarasai. The project requires high quality as the E262 route links Warsaw with St Petersburg and carries a large volume of traffic, including a hig