Skip to main content

Key route upgrades for Scotland

Major road projects in Scotland will improve the country’s transport connections. Plans are now in hand to fast-track the project to convert the A9 to dual carriageway status along its entire length. The road is a major transport artery to the north of Scotland, connecting the Central Belt in the south with the northern city of Inverness, providing the main gateway to the north of the country. The plans call for the upgrading of the A9 to dual carriageway status between Perth and Inverness. Work on the 5km
July 19, 2012 Read time: 2 mins
RSSMajor road projects in Scotland will improve the country’s transport connections. Plans are now in hand to fast-track the project to convert the A9 to dual carriageway status along its entire length. The road is a major transport artery to the north of Scotland, connecting the Central Belt in the south with the northern city of Inverness, providing the main gateway to the north of the country. The plans call for the upgrading of the A9 to dual carriageway status between Perth and Inverness. Work on the 5km section between Kincraig and Dalreddy will commence in 2015-2016. All 128km should be converted to dual carriageway by 2025, at a total cost of €3.8 billion (£3 billion). Within the next 12 months, consultants will be appointed to oversee the scheme, which has been required for some time. The A9 carries high volumes of tourist traffic with a high percentage of overseas drivers and the route is notorious for head-on collisions, many of which involve non-British drivers. In winter, the A9 can be particularly treacherous and the section between Perth and Inverness is frequently closed due to heavy snowfalls. Upgrading this section of the route to dual carriageway status should help improve both traffic flow and safety.

Meanwhile a shortlist of four consortia is bidding for key road projects in Scotland’s Central Belt. The €525.4 million (£415 million) improvement programme will cover widening sections of the M8, M73, M74 that currently experience severe congestion at peak periods. The consortia approved to bid for the work are: Scotia Roads Group; Scottish Roads Partnership; Caledonia Roads Group; Connect Roads and the firms involved in these consortia include many major UK and overseas contractors. Scotia Roads Group comprises: Costain, Iridium, Sir Robert McAlpine Capital Ventures and BAM/PGGM; while Scottish Roads Partnership is made up of Amey, Cintra, Meridiam Infrastructure Finance and Uberior Infrastructure Investments. Caledonia Roads Group comprises; Macquarie, Vialia Sociedad Gestora, FCC Construccion, John Graham Holdings and John Sisk & Son; while Connect Roads comprises Balfour Beatty and Galliford Try.

Related Content

  • New Clyde bridge project
    March 12, 2021
    A New Clyde bridge project is going ahead.
  • PPP earmarked to fund Melbourne’s East West Link road project
    September 24, 2013
    The Victoria state government in Australia is planning to build Melbourne’s East West Link road costing US$5.64 billion (AUD 6 billion) to $7.53 billion (AUD 8 billion) on public-private partnership (PPP) basis and will award construction deals by the end of 2013. There are four consortia shortlisted for the18km tolled motorway project: Momentum Infrastructure, consisting of Leighton, John Holland, Iridium and Dragados; Sicuro, made up of Egis, Hyundai, Impregilo, Salini, Aquasia and InfraLinx Capital. T
  • BAM and Iridium get the green light Ross link road in Ireland
    December 15, 2014
    The BAM PPP PGGM and Iridium consortium has been named preferred bidder for the N25 New Ross Bypass project in the Irish Republic. The US$270 million (€217 million) contract - Design, Build, Finance, Maintain and Operate - involves 13.6 km of dual carriageway on the N25 and N30 routes and 1.2 km of the carriageway New Ross N30 route. Construction is expected to support around 300 jobs across Ireland and will be undertaken by a joint venture of BAM Civil and civil engineering firm Dragados. The road will
  • Mott MacDonald Sweco JV to design part of A96 dualling, Scotland
    June 16, 2016
    A Mott MacDonald and Sweco joint venture has been appointed by Transport Scotland to carry out route option assessment and detailed design work for dualling of the A96 highway between Hardmuir and Fochabers. The nearly 47km stretch of the road will provide users with improved journey times between two of Scotland’s economic hubs, the cities of Inverness and Aberdeen. In 2011, the Scottish Government published its Infrastructure Investment Plan which set out the Government’s plans for infrastructure i