Skip to main content

Key road links being built in Algeria

In Algeria, a series of road projects are underway, as well as in neighbouring Tunisia. A key development in Tunisia is that work is ongoing for an 80km stretch of highway that will connect with Algeria’s East-West Highway. This will further elevate the importance of the East-West highway in Algeria as it already connects with new links in Morocco. The new section in Tunisia will be the next step in this northern route providing connectivity right across North Africa. When the entire 5,600km route is comple
April 12, 2013 Read time: 2 mins
In Algeria, a series of road projects are underway, as well as in neighbouring Tunisia. A key development in Tunisia is that work is ongoing for an 80km stretch of highway that will connect with Algeria’s East-West Highway. This will further elevate the importance of the East-West highway in Algeria as it already connects with new links in Morocco. The new section in Tunisia will be the next step in this northern route providing connectivity right across North Africa. When the entire 5,600km route is complete users will be able to set off from Morocco and drive through to Egypt.

The new Transrhumel viaduct currently being built in the centre of Constantine will also be connected to Algeria’s East-West highway by a second junction. Once this 4.4km viaduct has been completed, users will be able to access the four corners of Constantine from the highway without having to travel through the town centre. The Transrhumel link will be completed in 2014 and is being built by Brazilian company Andrade-Gutierrez. Work to widen national road 1 (RN-1) between Ghardaïa and Laghouat will commence in May 2013. Seven junctions will be built along the 103km stretch of highway in a bid to reduce road accidents. The project will cost some US$113 million. Meanwhile in Blida, six local work projects are planned in a bid to reduce traffic congestion. A bus depot is also planned for the city. One is planned near the headquarters of the first military region, another is planned near Saad Dahleb University and another is planned for the Khazrouna intersection. Work is scheduled to begin in 2014.

Related Content

  • Second giant moveable scaffolding system set for Mersey Gateway
    May 4, 2016
    A second movable scaffold system (MSS) is on its way from China to the UK town of Halton, as part of the Mersey Gateway Project, a toll bridge over the Mersey River in England. The machine will be used to build the south elevated approach viaduct that will connect the main road network in the town of Runcorn to the Mersey Gateway Bridge, now under construction.
  • Tunnel project of Chilean capital Santiago
    April 8, 2015
    Tunnel construction in Chilean capital Santiago will help cut chronic congestion – Mauro Nogarin & Mike Woof write. Chile’s capital Santiago is a thriving city having benefited from the country’s economy growing strongly in recent years. The massive copper mining sector has helped boost the country’s GDP significantly in the past few decades, also aided by the growing international reputation of Chile’s large wine industry. The steady economic growth has resulted in an equally steady growth in average incom
  • STRABAG wins contract for Hamburg, Germany
    August 26, 2020
    STRABAG has won a major highway contract in Hamburg, Germany.
  • Winning formula for formwork
    July 19, 2012
    An unusual application of formwork took place recently in France, while formwork using one particular engineering construction kit was used for the first time in Poland. Guy Woodford reports An 80m long wild game underpass is an innovative feature of the Route Nationale 88 (RN 88) expansion in south-west France. For construction of the arched underpass tunnel, a PERI tunnel formwork carriage using VARIOKIT engineering construction kit was used. Thanks to the equipment’s easy handling, along with pre-assembl