Skip to main content

Key road deal for Italy

A joint venture comprising Impregilo and Astaldi is to handle a key road upgrade contract in Italy. The deal is worth some €791 million and will be carried out over a period of 92 months.
March 22, 2012 Read time: 1 min
A joint venture comprising 3149 Impregilo and 1324 Astaldi is to handle a key road upgrade contract in Italy. The deal is worth some €791 million and will be carried out over a period of 92 months. The project involves improvements to a 38km section of the Jonica National Road.

For more information on companies in this article

Related Content

  • Astaldi wins Polish S7 contract between Naprawa and Skomielna Biala
    March 3, 2016
    Astaldi, a global construction company based in Rome, has won a contract worth nearly €222 million for construction of Poland’s S7 dual carriageway between Naprawa and Skomielna Biala. The contract, awarded by the Polish General Directorate for National Roads and Motorways (GDDKiA), includes construction of a 2km tunnel under the Lubon Maly massif, 38 bridges and viaducts and three motorway services. There will also be 25km of access roads and two junctions. The north-south S7, when completed, will ru
  • Italians to tender for Libyan project
    May 28, 2012
    Work on the Libyan section of the North African coastal highway now looks set to go ahead. Two consortia from Italy are to tender for the pre-qualifying stage of the US$3 billion project. The highway will run some 1,700km from Libya's border with Tunisia all the way to the border with Egypt. This is the final section in the new highway running all the way from Morocco in North West Africa to Egypt in the North East.
  • Key project for India
    February 15, 2012
    In India a major highway deal has been agreed for a road project in Gujarat worth an estimated US$810.8 million.
  • Astaldi begins drilling tunnels on Poland’s S7 dual carriageway
    March 14, 2017
    Italian contractor Astaldi has begun drilling two parallel tunnels as part of its S7 dual carriageway project in Poland. Each tunnel, between Naprawa and Skomielna Biala and under the Lubon Maly massif, will each be just over 2km long. Astaldi, based in Rome, won the three-year S7 dual carriageway project worth around €225 million in 2016 Work includes 38 bridges and viaducts and three motorway services. There will also be 25km of access roads and two junctions. The north-south S7, when complete