Skip to main content

Key Polish infrastructure project delivered 6 months ahead of schedule

Poland's most important infrastructure project of the past few years, a new 106 km section of the A2 motorway Segment II between Owiecko on the German border and Nowy Tomyol, opened this week, six months ahead of schedule.
April 24, 2012 Read time: 1 min
Poland’s most important infrastructure project of the past few years, a new 106 km section of the A2 motorway Segment II between Œwiecko on the German border and Nowy Tomyœl, opened this week, six months ahead of schedule. Part of the Trans-European Network Berlin-Warsaw-Minsk-Moscow route, the €1.3 billion (US$1.75 billion) project was delivered as a Public-Private-Partnership (PPP) by the project company, 3533 Autostrada Wielkopolska SA II.

A 945 Strabag-led consortium was commissioned to build the 106 km section of motorway between the summer of 2009 and the autumn of 2011. More than 90 per cent of the construction works were carried out by Strabag, making this the largest single order in the company’s history.

Inauguration of the new section was attended by VIPs from politics and business, including Polish president Bronis³aw Komorowski and the minister president of the German state of Brandenburg, Matthias Platzek. The new motorway section had originally been planned to open in the middle of May, 2012, and charge a per-kilometre toll but it will remain free of charge to use for the next six months.

For more information on companies in this article

Related Content

  • Funding problems for major Polish highway project
    May 9, 2012
    The long tale of woe concerning Poland’s troubled A2 highway project looks set to continue with the latest developments in the case. The Chinese contractor China Overseas Engineering Group Co (Covec) is appealing against a decision made by the Polish national road authority GDDKiA. The Polish authorities cancelled the contract that COVEC had previously been awarded to build a section of the A2 highway between Warsaw and Lodz.
  • Poland’s next A2 motorway section to cost €348million
    January 21, 2019
    Almost €348 million will be needed for a 32km extension to Poland’s A2 motorway from Biala Podlaska to Terespol, near the border with Belarussia. A tender for a design and build contract is expected to be called in 2020. But funding is still not for certain under the National Road Construction Programme that looks at work until 2023. Recently, a €1.3 million contract was signed with Multiconsult Polska to prepare an investment plan. The A2 runs from west to east through central Poland, from the Pol
  • Success of toll road operators' conference
    July 12, 2012
    The 37th ASECAP Annual Study and Information Days held in Krakow, Poland, gathered some 300 road transport CEOs, experts and government decision-makers making the event "a huge success." Patrick Smith reports Toll road operators from across Europe have met to discuss the state of their businesses in the current economic climate and how to tackle it. Fabrizio Palenzona, the outgoing President of ASECAP (the European professional Association of Operators of Toll Road Infrastructures) and president of AISCAT (
  • Polish road dispute
    February 28, 2012
    A string of legal and political battles look likely in the aftermath of a broken highway contract in Poland.