Skip to main content

Key highway link investment in Malaysia will boost connectivity

A US$137.6 million investment is being targeted at the Pan Borneo Highway connecting the Malaysian states of Sarawak and Sabah. This investment will be supplied by Malaysia’s Federal Government. Overtaking lanes will be built at critical locations along the 207km stretch linking Bintulu and Miri as well as the 217km stretch connecting Bintulu and Sibu.
April 13, 2012 Read time: 1 min
A US$137.6 million investment is being targeted at the Pan Borneo Highway connecting the Malaysian states of Sarawak and Sabah. This investment will be supplied by Malaysia’s Federal Government. Overtaking lanes will be built at critical locations along the 207km stretch linking Bintulu and Miri as well as the 217km stretch connecting Bintulu and Sibu. The stretches are considered a high priority due to congestion and a high percentage of heavy and commercial vehicles using the route at these points. The highway at present carries some 10,000 vehicles/day on average. A study is currently being conducted by the 4886 Economic Planning Unit (EPU) to identify other areas of the Pan Borneo Highway that will require overtaking lanes. The government has said it will build dual-carriageways in sections carrying 20,000 vehicles/day.

For more information on companies in this article

Related Content

  • Malaysia to tender for more Pan Borneo sections
    April 30, 2019
    The Malaysian government will soon tender for three more sections of the 706km Pan Borneo Highway project in the state of Sabah. The Pan Borneo Highway - also known as Trans-Borneo Highway or Trans-Kalimantan Highway - is a road network on Borneo Island connecting the Malaysian states of Sabah and Sarawak to the country of Brunei and Indonesia’s Kalimantan region. The length of the section within the Malaysian states is likely to be just under 2,100km. The Bruneian section is 168km and the Indonesian
  • Transport spending a priority for Malaysia
    November 2, 2023
    Transport spending is a key a priority for Malaysia.
  • Major Malaysian highway projects in hand
    July 24, 2013
    Malaysia’s Lebuh Raya Pantai Timur 2 (LPT2), highway is expected to open for traffic by September 2014. A series of delays have held back work on the 184km highway, although the 72km Bukit Besi-Kuala Terengganu section has been open since the third quarter of 2011. Some of the delays can be attributed to price increases in the cost of materials, which caused problems for contractors involved with the project. Work is ongoing at present on the section of highway from Bukit Mempusi-Kemamn's Felda Kerteh 6. Me
  • Going Digital helped the Government of Malaysia leverage digital twins to deliver trusted information for better project and asset management.
    March 30, 2020
    In 2014, the government of Malaysia announced a plan to fully develop and upgrade the two-lane trunk road across Malaysia’s largest state, Sarawak, to accelerate socioeconomic growth in East Malaysia.