Skip to main content

A key expressway project is due in Nepal

The Nepalese Government plans to open a key expressway project to tender. The Ministry of Physical Planning works and Transport Management is inviting bidders to show their interest in the construction of the Kathmandu-Nijgadh-Pathlaiya Terai/Madesh Expressway project. This new road link is intended to be offered under a PPP/BOT model. The 76km expressway is expected to cost US$853 million to construct. A feasibility study has been carried out and the expressway will be designed to meet the Class – A Catego
July 26, 2012 Read time: 2 mins
RSSThe Nepalese Government plans to open a key expressway project to tender. The Ministry of Physical Planning works and Transport Management is inviting bidders to show their interest in the construction of the Kathmandu-Nijgadh-Pathlaiya Terai/Madesh Expressway project. This new road link is intended to be offered under a PPP/BOT model. The 76km expressway is expected to cost US$853 million to construct. A feasibility study has been carried out and the expressway will be designed to meet the Class – A Category Road status. It will feature 84 bridges, of which 22 will have spans of 30-50m and seven will span 115m. The road will be tolled, with revenues being collected by the winner and the total package will include handover of the project by 2035 to the Nepalese authorities.

The Nepalese Government has conditions and only joint ventures or companies with experience in carrying out infrastructure projects worth over $1.5 billion, or BOT highways and bridge projects worth over $500 million in the last 10 years will be eligible. Similarly, bidders should have net worth of $150 million or more. The contract winner will have to upgrade the existing 18.3km Nijgadh-Pathlaiya East-West Highway from its present two lane layout, to four lanes. This section is expected to cost about $26 million. The project manager has stated that the selection procedure will be chosen as per Nepal’s Public Procurement Act, and based on BOT practices prepared by the Project Studies committee.

Related Content

  • Croatia: Peljeski Bridge decision in summer 2017
    November 21, 2016
    Croatia’s minister of infrastructure, Oleg Butkovic, said a winner will be chosen to build the controversial Peljeski Bridge on the Adriatic Sea coast by summer 2017. The project, valued at around €370 million, will be carried out in three phases. In June, a tender was started by the national roads company Hrvatske Ceste but was halted last month over complaints by some bidders about pre-qualification issues. The State Commission for Control of Public Ordering recently rejected the pre-qualificatio
  • Nepal’s road safety awareness programme is now commencing
    April 12, 2013
    A half day seminar has been run in Nepal with aim of reducing road fatalities. The seminar focussed on the Role of Roads Board Nepal in creating road safety awareness. This event was set up by the Road Board Nepal, a government agency established under the Road Board Act 2002. The agency has the aim of providing a sustainable fund for planned maintenance of the roads in association with local NGOs; Nepal Forum for Rural Transport and Development (NFRTD) and Nepal Road Safety Society. Engineer Ramesh Bastola
  • Key Chilean connections
    November 27, 2012
    Strong interest is being shown in the construction sector in Chile for the project to build the Chacao Bridge. The tender process is due to open in the first half of 2013 and a large number of contractors, over 30, have already acquired terms and conditions of the works package. The construction project is expected to cost US$740 million. Bidding is expected to close in early 2014 and the winner will be selected and the contract awarded. Work should start in 2015 and the completion date will be in 2019. A
  • New highway for Nepal
    August 16, 2012
    A new stretch of highway is now open to traffic in Nepal. The Nepalthok-Khurkot Road recently had its official opening. Some US$46.2 million was spent on the section of highway, with much of the funding being provided by the Japanese Government. The Nepalthok-Khurkot section of road forms part of a larger project and is Phase 3, Part-I of the Banepa-Sindhuli-Bardibas BP highway.