Skip to main content

A key expressway project is due in Nepal

The Nepalese Government plans to open a key expressway project to tender. The Ministry of Physical Planning works and Transport Management is inviting bidders to show their interest in the construction of the Kathmandu-Nijgadh-Pathlaiya Terai/Madesh Expressway project. This new road link is intended to be offered under a PPP/BOT model. The 76km expressway is expected to cost US$853 million to construct. A feasibility study has been carried out and the expressway will be designed to meet the Class – A Catego
July 26, 2012 Read time: 2 mins
RSSThe Nepalese Government plans to open a key expressway project to tender. The Ministry of Physical Planning works and Transport Management is inviting bidders to show their interest in the construction of the Kathmandu-Nijgadh-Pathlaiya Terai/Madesh Expressway project. This new road link is intended to be offered under a PPP/BOT model. The 76km expressway is expected to cost US$853 million to construct. A feasibility study has been carried out and the expressway will be designed to meet the Class – A Category Road status. It will feature 84 bridges, of which 22 will have spans of 30-50m and seven will span 115m. The road will be tolled, with revenues being collected by the winner and the total package will include handover of the project by 2035 to the Nepalese authorities.

The Nepalese Government has conditions and only joint ventures or companies with experience in carrying out infrastructure projects worth over $1.5 billion, or BOT highways and bridge projects worth over $500 million in the last 10 years will be eligible. Similarly, bidders should have net worth of $150 million or more. The contract winner will have to upgrade the existing 18.3km Nijgadh-Pathlaiya East-West Highway from its present two lane layout, to four lanes. This section is expected to cost about $26 million. The project manager has stated that the selection procedure will be chosen as per Nepal’s Public Procurement Act, and based on BOT practices prepared by the Project Studies committee.

Related Content

  • East End Crossing Project—Availability payment P3 in action
    July 14, 2017
    Indiana exercised its authority to use a P3 contract when it partnered with Kentucky for new bridges across the Ohio River. Barney Allison and John Smolen* explain the groundbreaking availability payment deal. Earlier this year, traffic began rolling over the new tolled Lewis and Clark Bridge spanning the Ohio River from northern Kentucky to southern Indiana. The cable-stayed bridge is part of the award-winning Ohio Bridges Project to untangle traffic within the greater metropolitan area of Louisville, Kent
  • Loan to boost key Nepal road works
    May 29, 2023
    A loan will boost works on a key Nepal road.
  • Sandvik wins tunneling machine deal in Australia
    July 6, 2015
    Sandvik is supplying a major order of tunnelling machinery for use on a construction project in Australia. This deal is for a major tunnelling project in Sydney. The NSW Government, Transurban and the M7 Westlink Shareholders (the Project Sponsors) are in process to build, operate and maintain a tolled motorway linking the M1 Pacific Motorway at Wahroonga to the Hills M2 Motorway at West Pennant Hills. The new route will be called NorthConnex.
  • Highway deals for three Indian states
    April 24, 2012
    The authorities in India have given the go-ahead for a series of highway projects in the states of Tamil Nadu, Orissa and Rajasthan. These will be worth US$693.5 million and are being planned under the design, build, operate, finance and transfer (DBOFT) model. The National Highways Development Project (NHDP) will see upgrades to the Madurai-Ramanathapuram route in Tamil Nadu, the Chandikhole-Dubari-Talcher road in Orissa to four-lane section and a 79km section of the Gomati Chauraha-Udaipur road in Rajasth