Skip to main content

Key Canadian interchange

In Canada Transport Quebec is using stringent requirements to ensure that the planned Turcot Interchange reconstruction project stays within budget and is completed on scheduled by 2018. This US$2.95 billion (C$3 billion) project includes replacing the Montreal West, Turcot, Angrignon and De La Verendrye interchanges as well as portions of the 720, 15 and 20 Highways.
March 21, 2012 Read time: 1 min
In Canada Transports Québec is using stringent requirements to ensure that the planned Turcot Interchange reconstruction project stays within budget and is completed on scheduled by 2018. This US$2.95 billion (C$3 billion) project includes replacing the Montreal West, Turcot, Angrignon and De La Verendrye interchanges as well as portions of the 720, 15 and 20 Highways. In June 2013, Transport Quebec will announce its choice of consortium to handle the contract for the project. Firms tendering have to submit bids by 28 March 2012. The interchange update is required to deal with congestion and handle current as well as anticipated traffic volumes. At present the Turcot Interchange is used by 300,000 vehicles/day, of which 30,000 are trucks.

Related Content

  • Cost increases for major Chilean highway project
    November 15, 2013
    The cost of Chile’s Vespucio Oriente highway project is increasing, while its completion also looks set to be delayed. A 13% budget increase is now required due to additional costs from a number of factors such as urban landscaping, according to Business News Americas. The Américo Vespucio Oriente (AVO) expressway is being built in Chilean capital Santiago and was originally expected to cost in the region of US$940 million. However Chile’s Public Works Ministry, MOP, has said that the route will now cost so
  • Canada: work officially starts on Montreal’s Champlain Bridge
    June 25, 2015
    Canada’s infrastructure minister, Denis Label, officially broke ground for Montreal’s replacement Champlain Bridge, saying the project will likely cost US$3.42 billion. The 3.4km Champlain Bridge Corridor Project, including spans and highway expansions, is expected to be completed by 2019. SNC-Lavalin, the 50% stakeholder in the winning consortium Signature on the Saint-Lawrence, recently announced it had finalised the deal with new Champlain Bridge owner Infrastructure Canada. Signature on the Saint-
  • $66 billion for Florida transport infrastructure
    March 11, 2025
    $66 billion will be spent on Florida’s transport infrastructure over the next five years.
  • Montreal’s Champlain Bridge superstructure deal signed with Canam-Bridge
    May 22, 2015
    Canada-based Canam-Bridge has been chosen to fabricate the superstructure for the Champlain bridge project in Montreal as well as to supply steel. Marc Dutil, chief executive of Canam, a specialist bridge superstructure fabricator, expects at least 45,000tonnes of steel will be required for the 3.4km bridge that will span the St. Lawrence River which leads to the Great Lakes of North America. The contract is expected to be completed after a formal deal is reached between the SNC-Lavalin consortium con