Skip to main content

Kazan allocated US$263.14mn road repair budget for 2012

Kazan Mayor Ilsur Metshin said authorities would allocate US$263.14million to repair the city’s road network in 2012, compared to a total of $197.66million spent over the previous five years.
May 15, 2012 Read time: 1 min
Kazan Mayor Ilsur Metshin said authorities would allocate US$263.14million to repair the city’s road network in 2012, compared to a total of $197.66million spent over the previous five years.

Related Content

  • AEM: U.S. construction machinery exports down 21% in H1 2013
    August 20, 2013
    The Association of Equipment Manufacturers (AEM) U.S. say construction machinery exports dropped 21% during the first half of 2013, with US$10.8 billion shipped to global markets compared to $13.7 billion in H1 2012. The AEM report that nearly all world regions recorded double-digit declines, except Central America with a double-digit gain. Construction machinery exports to Europe in H1 2013, compared to H1 2012, declined 20% for a total $1.4 billion, with exports to Canada down 15% to a total value of $3.7
  • Older drivers in the US hit record numbers
    December 20, 2017
    The number of older drivers on the US road network continues to increase. According to the latest data from the Federal Highway Administration (FHWA), the number of drivers on the US road network hit a record- high in 2016 at 221.7 million. Of these, 41.7 million are 65 years or older. This age group is growing faster than any other, and is far outpacing their teenage counterparts.
  • Strabag tips stable progress in 2014, mirroring 2013 performance
    February 17, 2014
    Strabag’s output volume remained stable in 2013 reaching €13.573 billion - down just 3% compared to the €14.042 billion recorded in 2012. The construction firm’s first full year figures for 2013 also reveal an order backlog up by only 2% to €13.469 billion from €13.202 billion the previous year. Strabag says it expects output volume to remain stable in 2014 at €13.6 billion, with EBIT (earnings before interest and taxes) of at least €260 million – similar to the level forecast for 2013.
  • Road repairs for Riga’s routes
    May 14, 2018
    Instarmac’s Latvian partner, Delta Urban, has supplied reinstatement materials to assist with the rehabilitation of a number of roads and pavements throughout the centre of Riga. The project has been partly funded by the European Union and required hundreds of gullies and manholes to be repaired on some of Riga’s busiest roads. Delta Urban supplied the chosen contractors, Roakdeks and Parvalde, with UltraCrete M60 rapid strength bedding mortar and QC10 F rapid set flowable concrete for the repairs.