Skip to main content

June 2013

Double yellow lines signify an area where parking is not allowed at any time on a UK road.
June 24, 2013 Read time: 1 min
Double yellow lines signify an area where parking is not allowed at any time on a UK road although this narrow stretch in Swindon measures a mere 330mm wide which is insufficient even to allow most motorcycles to pass through. Following widespread and stinging criticism, the council has since repainted the lines black: Image courtesy of World Highways readers Dr John Bullas and Len Searle

Related Content

  • High performance, high mobility of wheeled pavers
    February 14, 2012
    New generation wheeled pavers aimed at use in territories such as the UK, Italy, South Africa and Southern Germany are now coming to market. Pavers in these countries are often expected to be driven from one part of a site to another or for short distances, which is why the additional mobility of the wheeled machine is preferred in many instances over similarly-sized tracked models. This preference for wheeled units comes in spite of the greater stability offered by tracked machines. BOMAG, Caterpillar and
  • UK death rate not falling fast enough in The Reported Road Casualties Great Britain Report 2013
    September 26, 2014
    Road safety lobby groups have criticised Britain for pushing down its annual road fatality rate by a further 2% in the past year, the lowest figure since records began in 1926. The Reported Road Casualties Great Britain 2013 (RRCGB) Annual Report, published in September 2014, reveals that 1,713 people were killed in road accidents in the country during 2013, with the number of people seriously injured down by 6% to 21,657 versus 2012.
  • Go with the flow with TrafFix Devices' Water Wall
    April 15, 2025
    TrafFix Devices says that its Water Wall barrier, made from durable low-density polyethylene plastic, is ideal for longevity and resistant to cracks and breakage.
  • Sandvik’s DT1131i jumbo and iSURE software in Iceland and Norway
    August 14, 2019
    Sandvik’s DT1131i three-boom, electro-hydraulic jumbo, iSURE tunnel management software and the latest drill bit hardware were recently put to the test in Iceland and Norway* Czech contractor Metrostav recently achieved 105m of tunnel excavation in a record-breaking six days. But it will be consistent performance and progress that will see Iceland’s Dyrafjordurgong Tunnel in the remote Westfjords region open on time and on budget. The 5.3km Dyrafjordurgong Tunnel is costing around €69 million and due