Skip to main content

June 2013

Double yellow lines signify an area where parking is not allowed at any time on a UK road.
June 24, 2013 Read time: 1 min
Double yellow lines signify an area where parking is not allowed at any time on a UK road although this narrow stretch in Swindon measures a mere 330mm wide which is insufficient even to allow most motorcycles to pass through. Following widespread and stinging criticism, the council has since repainted the lines black: Image courtesy of World Highways readers Dr John Bullas and Len Searle

Related Content

  • BOMAG’s smart asphalt compaction technology in use
    May 25, 2016
    BOMAG’s highly sophisticated compaction control technology is now being used successfully on the highway project to link Warsaw with St Petersburg. The system is being employed in the rural area around the border triangle of Lithuania, Latvia and Belarus. Lithuanian road contractor Panevezio Keliai won the package of works to upgrade a stretch of the E262 in Zarasai. The project requires high quality as the E262 route links Warsaw with St Petersburg and carries a large volume of traffic, including a hig
  • Integrated corridor management offers transportation efficiency
    May 28, 2013
    In the Intelligent Transportation Systems world, the concept of managing roadway or transportation corridors is not new. Smart Corridor concepts have existed for some time, such as the Santa Monica Smart Corridor system from the 1990s. Across the world, a new emerging model for operating roadway transportation networks called integrated corridor management (ICM) has emerged. This is particularly true in California, where several new ICM projects have or are being deployed. There is a new paradigm for corrid
  • Wirtgen’s compact and powerful milling machine
    April 25, 2024

    Wirtgen is introducing its W 150 Fi planer, a mid-sized machine that now benefits from technology first seen in the firm’s larger mills. Power comes from a 9litre John Deere diesel delivering 313kW that meets the Tier 4 Final/Stage V emissions requirements.

    The machine is designed to cut a 1.5m width to a depth of 330mm, though it can be fitted with different width drums as well as a range of tooth patterns to suit the needs of the customer and the work being carried out.

  • Scotland’s new Queensferry Crossing over the Forth Estuary
    December 23, 2015
    The new Queensferry Crossing under construction in Scotland will be the third landmark bridge spanning the Forth Estuary - Mike Woof writes When the new Queensferry Crossing over the Forth Estuary opens at the end of 2016, it will be the third landmark bridge to be built spanning this short stretch of water. Lying alongside the existing road bridge and the historic rail bridge, this new structure will be as groundbreaking as the two earlier crossings were at the time of their construction.