Skip to main content

June 2011

Roadsigns are required to give clear directions.
March 14, 2012 Read time: 1 min
Roadsigns are required to give clear directions.

Related Content

  • Industry AMS opts for safety in any direction
    January 25, 2017
    Italian company AMS explains how its crashworthy end terminals act like a crash cushion Industry AMS (Automation Manufacturing Services) has developed a crashworthy end terminal tested according to part 7 of the EN 1317 that is classified as a double-sided and bi-directional end terminal. Starting from the European version of the terminal, and based on the same architecture, AMS has designed the SMA (Safety Modular Absorber) as a reinforced end-terminal in order to be complaint with both the MASH and
  • Major innovations are coming to market in concrete slipforming
    March 6, 2017
    Tough competition is being seen in the specialised market for concrete slipforming machines, with new partnerships and new technology coming to market - Mike Woof writes GOMACO is boosting the versatility of its Commander slipformer further with the development of the new Three-Track Commander IIIx variant. This has been configured to cope with much tighter radii than previous versions of the Commander III, allowing it to slipform a radius of just 610mm. This suits the machine to applications such as sli
  • UK drivers urged not to eat at wheel after alarming survey
    February 21, 2014
    UK drivers are being urged to take a break and enjoy their food away from their vehicles, as road safety charity Brake and Direct Line reveal more than six in ten (62%) have eaten at the wheel in the past year. Further alarming figures revealed that three in ten (29%) unwrapped food themselves at the wheel - a telling symptom, says Brake and Direct Line, of busy lifestyles putting lives at risk. Studies have suggested eating a meal at the wheel increases your risk of a devastating crash as much as talking
  • Busy bridge in Beijing replaced quickly
    March 31, 2016
    The replacement of a very busy road bridge in China’s capital Beijing has been carried out successfully. Due to the volume of traffic using the bridge during week days, the work had to be carried out quickly so as to minimise traffic disruption. But despite being carried out in the centre of Beijing, the replacement work for the Sanyuan Bridge just took 43 hours from start to completion.