Skip to main content

June 2011

Roadsigns are required to give clear directions.
March 14, 2012 Read time: 1 min
Roadsigns are required to give clear directions.

Related Content

  • High production at high altitude for Liebherr’s Compactmix 1.0
    May 20, 2019
    A Liebherr Compactmix 1.0 is supplying the construction site for the V-cableway - or V-Bahn - project in the Swiss mountains with concrete. The project was a challenge both in terms of logistics and on-site operation. The Grindelwald-Männlichen Gondola Cableway company and Jungfraubahn railway company are planning to build a V-cableway that will open up both the Eiger Glacier and the Männlichen (Bernese Alps). From a joint terminal in Grindelwald-Grund, a tri-cable aerial cableway will lead to the Eiger
  • Four Seasons Volvo CE ice-breaking wheeled loaders
    February 20, 2014
    Four Seasons Landscaping is using its fleet of Volvo construction equipment to clear away snow and ice for road using customers across the northeast US coastal state of Connecticut. Connecticut is susceptible to extreme weather – from hot and humid in the summer to snow storms in the winter and temperatures dipping below -10°C. Although it’s the third smallest American state, northern Connecticut gets twice as much snow on average compared to the south. Most snow storms usually bring 12.7cm-20.3cm but on
  • A history lesson in private public partnerships
    April 12, 2012
    Michel Démarre gives some historical insights into public-private partnerships conceived to implement urban infrastructure projects, a concept that surprisingly dates back to as early as the 13th century! All over the world today, the role of public authorities in the process of planning and, in most cases, designing, financing and procuring urban roads is paramount. Even for modifications to existing roads, decisions are made by these public authorities (usually after due consultation with the population)
  • Nigeria road upgrade to boost capacity
    August 17, 2018
    Nigeria’s Federal Executive Council, (FEC) is giving its approval for an upgrade of the road running from Akwanga to Gombe. The 421km section of the A3 runs between Akwanga, Jos, Bauchi and Gombe and provides an important link between the centre of the country and Nigeria’s north east. A budget of US$973.6 million has been set for the work, which is expected to take four years to complete. The work involves widening the existing two lane highway into a dual carriageway with two lanes in either direction