Skip to main content

June 2011

Roadsigns are required to give clear directions.
March 14, 2012 Read time: 1 min
Roadsigns are required to give clear directions.

Related Content

  • Proper GPR Surveying Techniques
    May 10, 2019
    A sustainably good road surface often depends on how well understood is the ground underneath the road’s route. Brian Jones* offers some best practice and advice for getting the most from ground-penetrating radar investigations Ground-penetrating radar (GPR) is one of the most accurate non-destructive testing (NDT) methods available. To get the most from GPR surveying, it is absolutely essential to understand how GPR tools work and follow best practices when conducting surveys. Key areas to be aware o
  • Bomag is on track – London to Glasgow in 2 hours and 40 minutes
    July 1, 2022
    British Railways has big plans. Trains on the first 220 km from London Euston Station to Birmingham could be travelling at a speed of 360 km/h (225 mph) in as little as 10 years. The earthworks required for this are to be completed by as early as 2025. The project is considered one of the largest and most ambitious infrastructure projects in recent British history. It must meet the highest possible construction quality standards and evolve over the course of the project - setting new standards today and for tomorrow. The deployment of innovative BOMAG technologies and machines is therefore logical and consistent.
  • INTERMAT launches in South East Asia – Bangkok, June 8-10, 2017
    February 16, 2017
    As the 7th-ranked world power, South East Asia is one of the world’s most dynamic and high-growth zones. More than US$60 billion of investment in infrastructure projects is planned per year between now and 2022. The region’s importance to the global construction equipment sector can’t be overestimated.
  • TEM Italy building sites to start work on 11 June 2012
    June 1, 2012
    Italian motorway construction and management firm Tangenziali Esterne Milano (TEM) has revealed that work at the building sites for the Rivoltana-Truccazzano stretch of the east Milan ring road will start on 11 June 2012. The total cost of the project is expected to reach US$ 2.51bn (€2bn).