Skip to main content

June 2011

Roadsigns are required to give clear directions.
March 14, 2012 Read time: 1 min
Roadsigns are required to give clear directions.

Related Content

  • Vögele develops sophisticated new screeds
    February 13, 2013
    In addition to its new paving range, Vögele is offering improved screed technology for both European and US paving concepts. Designed for European customers, the new AB500 and AB600 extending screeds are designed to pave widths from 2-9.5m, while the VR500 and VR600 screeds have been developed for the North American market and for use with the firm’s VISION pavers. The VF500 features extending units in front of the basic screed while the VR600 has extending units behind the basic screed.
  • Groundbreaking calculator of greenhouse gas emissions
    April 12, 2012
    IRF launches CHANGER, a groundbreaking calculator of greenhouse gas emissions from road construction. Our world is changing, our climate is changing. Industry too is changing to meet the new social, environmental and economic challenges of our times. Already, the road sector has taken a decisive lead in this respect by transforming its practices and adopting new, more eco-friendly techniques and technologies. CHANGER is the latest flagship project in this evolution: the sign of an indust
  • Groundbreaking calculator of greenhouse gas emissions
    February 9, 2012
    Time for CHANGER IRF launches CHANGER, a groundbreaking calculator of greenhouse gas emissions from road construction. Our world is changing, our climate is changing.
  • China’s longest highway completed by end of June 2014
    March 27, 2014
    China’s new longest highway is due to be completed by the end of June 2014. Around 97% of Xinjiang region's 428.9km Aksu-Kashgar highway is said to have been completed to date. The new route will eventually cost just over US$2 billion (CNY 12.3 billion) and is scheduled to open at the end of September 2014.