Skip to main content

JPCS stage successful Innovation Day

JPCS highlighted the benefits of its alternative traditional concrete foundation solution, Groundscrew, its hand-applied microasphalt product, Rejuovopatch, and Slurry Seal, its 6mm and 15mm waterproofing solution, during the UK firm’s recent Innovation Day in county Shropshire, England.
April 28, 2014 Read time: 2 mins
Peter Shone, MD of JPCS, addresses delegates at the recent JPCS Innovation Day
7061 JPCS highlighted the benefits of its alternative traditional concrete foundation solution, Groundscrew, its hand-applied microasphalt product, Rejuovopatch, and Slurry Seal, its 6mm and 15mm waterproofing solution, during the UK firm’s recent Innovation Day in county Shropshire, England.

The event at Whitchurch Rugby Club was well attended by highways maintenance professionals from across the UK, who watched live demonstrations of Groundscrew and Rejuvopatch. Attendees then learned more about JPCS and its work across the UK before taking part in a Q&A session with a panel of local authority highway management representatives, who gave first-hand accounts of how Groundscrew, Rejuovopatch and Slurry Seal had enhanced their service provision.

Speaking after the event Peter Shone, managing director of JPCS, said, “During the Innovation Day we’ve not only been able to share the innovative products JPCS has developed and introduced to the highways industry over the past 20 years, we’ve been able to illustrate the benefits first-hand through live demos and heard from the end-users about quality, results and cost-effectiveness our innovations deliver.

“Groundscrew is Ideal for traffic signs and marker posts in highways. We showed how a single Groundscrew road sign installation can be completed within 20 minutes of arriving on site and how quickly and easily the system allows for signs to be removed and relocated.

“We also resurfaced a deteriorated area with Rejuvopatch, which is an effective waterproofing surface treatment for road deterioration. Attendees at the event were able to witness the transformation and see how the product repairs and re-profiles existing  surfaces – and in the Case almost reconstructing - to restore texture and improve skid resistance, with the area ready to be open to the public within 60 minutes.

“We believe in working in partnership with our customers and it is refreshing to hear directly from clients who have real challenges on their networks and find out what their needs are. We’ve had some great suggestions and ideas which we will endeavour to incorporate into our offering in the future.”

For more information on companies in this article

Related Content

  • Advances in materials testing
    April 10, 2012
    Quicker, better, more cost effective materials testing - Kristina Smith writes. Most developments in materials testing technology involve updating and upgrading existing machines, either to meet changes to standards or to satisfy new needs in the market. And occasionally, a manufacturer will come up with something completely new. PUMA - the precision unbound materials analyser - falls into the latter category. It has been developed by Cooper Research Technology and Nottingham Transportation Engineering Cen
  • FEHRL holds successful infrastructure research event in Brussels
    June 22, 2015
    FEHRL recently held the FIRM15 event in Brussels, focussing on innovative maintenance of transport infrastructure In all some 110 transport infrastructure research experts from Europe and beyond met for the 2015 FEHRL Infrastructure Research Meeting (FIRM15) at the Diamant Centre in Brussels, Belgium. These professionals discussed the overall theme of 'Innovative maintenance of transport infrastructure: Faster, cheaper, more reliable, safer and greener'. Throughout the two-day conference, several solution
  • Versatile pavement re-texturing machine
    February 6, 2012
    AN INNOVATIVE wet steel shotblasting machine developed by pavement re-texturing specialist Klaruw is now being tested in the UK.
  • THIS is a Paving Project– The I-15 CORE
    December 20, 2012
    Provo, Utah – The scope of the I-15 Corridor Expansion Project (I-15 CORE) in the state of Utah is nearly unprecedented because of the size of the project and the short completion deadline. Twenty-four miles (38.6 km) of removal and replacement of Interstate 15 between Lehi and Spanish Fork, widening the number of traveling lanes by two, for up to six lanes in each direction in 35 months. The new 364 lane miles (586 km) of concrete roadway will be slipformed 12 or 12.5 inches (305 or 318 mm) thick for a tot