Skip to main content

JLG launches new telehandler

JLG International has launched a new telehandler, the 250S. “We updated the machine in order to comply with the new emissions regulations,” said JLG marketing communications manager Xenia Kolijn. The telehandler has a Deutz engine and complies with Tier 4 final, said Kolijn.
April 19, 2013 Read time: 1 min
2199 JLG International has launched a new telehandler, the 250S. “We updated the machine in order to comply with the new emissions regulations,” said JLG marketing communications manager Xenia Kolijn. The telehandler has a 201 Deutz engine and complies with Tier 4 final, said Kolijn.

Stand: F9.904.5

%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 48408 0 oLinkExternal www.JLG.com www.JLG.com false /EasySiteWeb/GatewayLink.aspx?alId=48408 false false%>

 

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Related Content

  • Hexagon adds software firm to portfolio
    January 30, 2013
    Hexagon continues to develop its software portfolio with the acquisition of Listech, which will compliment its array of construction solutions and particularly those of its Leica Geosystems subsidiary. Listech offers software solutions that aid with data processing and help streamline workflows in land management, construction and engineering projects.
  • Putzmeister adds five-section pump
    January 6, 2017
    Putzmeister has added a five-section 38m, 160m3/hr concrete pump, which can be used to place loads inside buildings some 3m higher than the four-section option. Built on a 26tonne chassis, the new 38.5 can reach heights of 31m while leaving the final boom section to pass inside the building. In common with the company’s other machines, the 38.5 now has outrigger sensing, which feeds into the control system and prevents the boom from extending/slewing if the outriggers are not fully deployed. The machine als
  • Putzmeister adds five-section pump
    April 19, 2013
    Putzmeister has added a five-section 38m, 160m3/hr concrete pump, which can be used to place loads inside buildings some 3m higher than the four-section option. Built on a 26tonne chassis, the new 38.5 can reach heights of 31m while leaving the final boom section to pass inside the building. In common with the company’s other machines, the 38.5 now has outrigger sensing, which feeds into the control system and prevents the boom from extending/slewing if the outriggers are not fully deployed. The machine als
  • Dynapac introduces new compaction equipment
    January 6, 2017
    Focussing on advanced compaction and paving equipment, Atlas Copco Road Construction Equipment Division highlights a number of new products “We have been working hard and determent, listening carefully to our customer’s needs and present a great range of new and updated products.” says Herman Matthyssen, vice president marketing west. “Up-time, ergonomics, reliability and serviceability are key success factors nowadays."