Skip to main content

Jerusalem bottleneck route to be upgraded

The upgrading of Highway 1 between Sha'ar Hagay and the entrance to Jerusalem, Israel, a 2.5 billion NIS project (US$733 million), is expected to take five years to complete.
March 1, 2012 Read time: 3 mins
The upgrading of Highway 1 between Sha'ar Hagay and the entrance to Jerusalem, Israel, a 2.5 billion NIS project (US$733 million), is expected to take five years to complete.

Highway 1 is the main highway connecting Tel Aviv with Jerusalem, and is heavily congested, especially at the entrances to Tel Aviv and Jerusalem. The section between Sha'ar Hagay and Jerusalem is also congested at times because of the many accidents and breakdowns caused by the high slopes and winding nature of the section.

The latest works include shortening the route by several kilometres; expanding the road to three lanes in each direction and constructing interchanges, tunnels and bridges.

The work will be executed by INRC, which will publish tenders for the project over the coming months.

According to the plan, the road segment between the Sha'ar Hagay and Shoresh interchanges will be elevated so as not to damage surroundings and the environment. A new interchange will be built in Ramat Ilan, 700m before the Shoresh interchange, and an ecological bridge will be built that will connect the two sides of the highway and enable pedestrians and animals to cross the road.

The road to Abu Gosh, Ein Rafa and Ein Nakuba  will run under the main highway, while the old Ein Hemed Bridge will be replaced with a new bridge.

Harel interchange will also be replaced by two 650m long tunnels that will pass under the crest and improve access to Mevaseret Zion. Nearby, a park and go parking area will be built with shuttle services to Jerusalem and back.

At the Motza Curve, the dangerous section will be removed and two parallel 800m long bridges will be constructed over the Motza Valley, Arazim Valley and Arza Stream, each with three lanes.

At the entrance to Jerusalem, it is planned that the constant traffic jams will be ended with the connection to Road 9 leading to the north of the city, and Road 16 that will be constructed in the future connecting Motza to Givat Mordechai, providing an additional entrance south of the city. An interchange will be built at Ginot Sakharov.

INRC has also published a tender for the construction of an interchange at Golani Junction, one of the worst bottlenecks in northern Israel. It will become an interchange within three years. The junction lies on the roads between central Israel and Tiberias.

The project, part of the Israel Routes programme will cost some NIS 350 million ($102.5 million).

The interchange will be the first of seven interchanges that will be built along Road 77 in order to create an uninterrupted and unsignalised route from the centre to the north of Israel.

Related Content

  • Royal Haskoning DHV’s Saudi bottleneck busting contract
    August 13, 2012
    Royal Haskoning DHV has been selected to tackle 30 major traffic bottlenecks in the Saudi Arabian capital Riyadh over the next two years. ArRiyadh Development Authority (ADA) decided to award the US$1.87million (€1.5mn) contract to the Dutch project management, engineering and consultancy service provider following a call for tenders. The population of Riyadh has risen dramatically over the past few decades and currently stands at around 5.4 million and, as a result, the city's roads and motorways are reach
  • New bridge being planned for German city Bonn
    July 16, 2018
    A new bridge project is being planned for the German city of Bonn. The city has three bridges crossing the Rhein River, the North, South and Kennedy Bridges. The North Bridge is in need of replacement as it is no longer able to meet the city’s traffic needs. The existing structure will be demolished and replaced with a new bridge in a project worth €205 million. Plans should be ready for the new link in 2020, with construction expected to commence in 2028.
  • Virginia interchange contract awarded
    October 31, 2016
    The contract for a diverging diamond interchange (DDI) has been awarded in the US state of Virginia. The project will cost close to US$100 million and will be built in Stafford County. The contract will be handled by Shirley Contracting Company, of Lorton. The new DDI facility will replace the existing Interstate 95/Route 630 (Courthouse Road) interchange. The aim of the project is to increase traffic capacity as growing vehicle use is expected at this location in the Fredericksburg District. The work will
  • Poland's A1 motorway progressing well
    February 9, 2012
    The second major phase of a north-south motorway in Poland is well underway. It will reduce congestion and improve safety as Patrick Smith reports Before the whistle blows to herald the start of Euro 2012, Poland's main seaport Gdansk will boast new roads, a new airport and a new stadium. The historic city in the north of the country on the Baltic coast will be one of the venues for football's 14th European Championship, being co-hosted by Poland and Ukraine.