Skip to main content

Jerusalem bottleneck route to be upgraded

The upgrading of Highway 1 between Sha'ar Hagay and the entrance to Jerusalem, Israel, a 2.5 billion NIS project (US$733 million), is expected to take five years to complete.
March 1, 2012 Read time: 3 mins
The upgrading of Highway 1 between Sha'ar Hagay and the entrance to Jerusalem, Israel, a 2.5 billion NIS project (US$733 million), is expected to take five years to complete.

Highway 1 is the main highway connecting Tel Aviv with Jerusalem, and is heavily congested, especially at the entrances to Tel Aviv and Jerusalem. The section between Sha'ar Hagay and Jerusalem is also congested at times because of the many accidents and breakdowns caused by the high slopes and winding nature of the section.

The latest works include shortening the route by several kilometres; expanding the road to three lanes in each direction and constructing interchanges, tunnels and bridges.

The work will be executed by INRC, which will publish tenders for the project over the coming months.

According to the plan, the road segment between the Sha'ar Hagay and Shoresh interchanges will be elevated so as not to damage surroundings and the environment. A new interchange will be built in Ramat Ilan, 700m before the Shoresh interchange, and an ecological bridge will be built that will connect the two sides of the highway and enable pedestrians and animals to cross the road.

The road to Abu Gosh, Ein Rafa and Ein Nakuba  will run under the main highway, while the old Ein Hemed Bridge will be replaced with a new bridge.

Harel interchange will also be replaced by two 650m long tunnels that will pass under the crest and improve access to Mevaseret Zion. Nearby, a park and go parking area will be built with shuttle services to Jerusalem and back.

At the Motza Curve, the dangerous section will be removed and two parallel 800m long bridges will be constructed over the Motza Valley, Arazim Valley and Arza Stream, each with three lanes.

At the entrance to Jerusalem, it is planned that the constant traffic jams will be ended with the connection to Road 9 leading to the north of the city, and Road 16 that will be constructed in the future connecting Motza to Givat Mordechai, providing an additional entrance south of the city. An interchange will be built at Ginot Sakharov.

INRC has also published a tender for the construction of an interchange at Golani Junction, one of the worst bottlenecks in northern Israel. It will become an interchange within three years. The junction lies on the roads between central Israel and Tiberias.

The project, part of the Israel Routes programme will cost some NIS 350 million ($102.5 million).

The interchange will be the first of seven interchanges that will be built along Road 77 in order to create an uninterrupted and unsignalised route from the centre to the north of Israel.

Related Content

  • Paso de las Leña tunnel between Argentina and Chile
    December 22, 2016
    A new tunnel between Chile and Argentina will boost trade and transport between the two countries - Mauro Nogarin writes The international Tunnel Paso Las Leñas will stretch 11.5km at 2,050m above sea level through the Andes. Once complete, it will greatly improve the connectivity and integration between the Chilean O'Higgins region with the Argentine Mendoza region.
  • African Development Bank funds road to Africa’s largest wind farm
    February 20, 2014
    Shem Oirere discusses a new road connecting with a wind farm development in Kenya The African Development Bank will provide 45% of the funding needed for the rehabilitation and rebuilding of a new 200km road which leads to Africa's largest wind farm project, located in northern Kenya. The bank said the $13.5 million grant for rehabilitation of the existing Laisamis – Ngurunit – llaut - South Horr – Loyangalani road- will be provided by the Government of the Netherlands. The bank says works on the road will
  • Tunnels eliminate bottlenecks
    February 10, 2012
    Some of the bottlenecks on the multi-lane Mittlere Ring, Munich, Germany, one of the main arterial roads circling the city centre have been eliminated by the addition of new tunnels. The Luise-Kiesselbach Square, the last section of this road improvement effort, is an important traffic hub south-west of the city where motorways A96 from Lindau and A5 from Garmisch meet, causing long delays in daily rush-hour traffic, writes Patrick Smith.
  • Florida highway rebuild project
    May 2, 2018
    Rebuilding a congested stretch of highway in Florida will cut congestion and boost safety for commuters - Mike Woof writes. Florida’s 214km-long I-4 highway provides a key transport route between Tampa and Daytona Beach, but has an unenviable reputation for both congestion and safety, with frequent delays due to heavy traffic as well as crashes. The stretch running through the city of Orlando is particularly prone to jams at peak periods, with huge traffic volumes resulting in vehicles having to slow to a c