Skip to main content

JCB will exhibit two waste transfer machines in the 4CXWM and the JS20MH

JCB is adding to its waste handling range with the launch of the JS20MH materials handler and the 4CXWM wastemaster backhoe loader. The 20 tonne JS20MH is the firm’s first dedicated materials handler for the waste and recycling industries. Based on the JS160W Wastemaster wheeled excavator, the JS20MH uses a new undercarriage and chassis design with a central slew turret delivering increased stability. Powered by a 97kW (130hp) JCB Dieselmax engine the machine has a 5.7m straight boom with either a 4m goosen
January 6, 2017 Read time: 2 mins
Waste handling duo join JCB line-up
255 JCB is adding to its waste handling range with the launch of the JS20MH materials handler and the 4CXWM wastemaster backhoe loader. The 20 tonne JS20MH is the firm’s first dedicated materials handler for the waste and recycling industries. Based on the JS160W Wastemaster wheeled excavator, the JS20MH uses a new undercarriage and chassis design with a central slew turret delivering increased stability. Powered by a 97kW (130hp) JCB Dieselmax engine the machine has a 5.7m straight boom with either a 4m gooseneck dipper or a 3.6m materials handling dipper arm.

The 4CX Wastemaster backhoe loader is the first machine of its kind to be developed for the waste market. The machine has both front and rear stabiliser legs that can raise the chassis well clear of the ground. A wide range of hydraulic attachments allow the machine to be used inside waste bins for compact and materials handling duties, while a hook lift means that the machine can move bins and skips on site..

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.JCB.com www.JCB.com false http://www.jcb.com/ false false%>

For more information on companies in this article

Related Content

  • Sleipner’s highlights system for moving excavators
    February 13, 2013
    Sleipner will explain the principle behind its “revolutionary method to improve the overall productivity in open-pit mines, quarries and construction sites.” The improvement is based on moving excavators around the site much faster than before, and additionally the Sleipner method saves time and money and considerably increases the excavators’ life, says the company.
  • Goldhofer rescues O&K RH 120-E from Calenturitas de Prodeco Mine
    November 1, 2016
    It was reportedly a logistical challenge to collect a massive front shovel excavator from the open pit coal mine Calenturitas de Prodeco in north-eastern Colombia. The twin engines of the 290-tonne O&K RH 120-E mining excavator had given up the ghost and could not be repaired on site, leaving the monster stranded atop a high mound of earth. So the mining company contracted heavy haulage specialist Boom Logistics to collect the excavator and transport it to the repair shop 22km away. http://www.goldho
  • Elliott product serves as material handling aerial platform
    March 7, 2014
    Elliott Equipment unveiled a “two-in-one” long-reach aerial at Conexpo 2014 on Thursday. The E160 e-line material handling aerial work platform features a 64m working height, high-capacity work platform and a seated rotating control station mounted on a commercial truck or track vehicle carrier. “It’s a material handling, aerial platform,” said David Phillips, manager of global business development and marketing at Elliott. “It’s a two-in-one solution.” The aerial is designed for utility and construction
  • New Roadtec heavy-duty tracked paver features high-density screeds
    January 6, 2017
    Roadtec has introduced the new heavy-duty steel track RP-2505 paver at bauma 2013. The model on display features high-density screeds with a twin tamper bar screed, which was developed and manufactured in Germany.