Skip to main content

Japanese loan to upgrade Cambodian highway

Cambodia’s National Road 5 is to be upgraded thanks to a concession loan provided by Japan. Worth some US$90.5 million this sum will be used to improve an 83.5km stretch of the route between Battambang and Sri Sophorn. The work on National Road 5 will start in June 2015 and is expected to be complete by May 2018. Once complete the upgraded section of road will offer both safety and capacity improvements over the existing link.
May 20, 2013 Read time: 1 min
Cambodia’s National Road 5 is to be upgraded thanks to a concession loan provided by Japan. Worth some US$90.5 million this sum will be used to improve an 83.5km stretch of the route between Battambang and Sri Sophorn. The work on National Road 5 will start in June 2015 and is expected to be complete by May 2018. Once complete the upgraded section of road will offer both safety and capacity improvements over the existing link.

Related Content

  • Kenya highway tender process underway
    June 8, 2018
    The tendering process for a key stretch of highway is underway in Kenya at present, attracting strong interest. The US$246.5 million project is the second phase of the upgrade for the Dongo Kundu bypass, with the work expected to take 36 months to complete and construction scheduled to commence in August 2018. The first phase of the project has been carried out by the Chinese contractor CCECC. The route is being improved to dual carriageway status, with two lanes in either direction, which will boost its
  • £185 million deal for A9 in Scotland
    August 9, 2024
    A £185 million deal has been awarded for the A9 in Scotland.
  • Chilean Government develops secondary road investment scheme
    October 30, 2013
    A new programme of works in Chile will see major maintenance being carried out on the country’s extensive network of secondary roads. The plans have been set out by the Ministry of Public Works (MOP) and the works will be offered under a new concession framework that is planned to be announced in the first quarter of 2014. The works will require up to 30% of the MOP's annual budget, some US$594 million. Meanwhile MOP has also signed a deal with the highway operator Autopista de Aconcagua. This will see upgr
  • Texas toll road opening in 2018
    December 15, 2017
    Work on the 360 Tollway in the US State of Texas should be complete in 2018. The link measures 15.5km long and runs between US287 and Camp Wisdom Road. The project is expected to have cost US$340 million once the work has been fully completed. Building work for the route commence in 2015 and the new link is intended to reduce traffic congestion in the Arlington area, lowering journey times for drivers.