Skip to main content

January February 2015

Extra compaction forces can be delivered using adapted equipment
February 24, 2015 Read time: 1 min
Extra compaction forces can be delivered using adapted equipment

Related Content

  • Maybe Hire takes on Whorlton Bridge
    March 14, 2025
    For refurbishment of the old English bridge, a temporary cable crane structure - designed by CaSE Civil & Structural Engineering - used a range of Mabey Hire’s propping equipment, including the Mass 50, System 160 and Mat 125 products.
  • GreyStone highlights Unibody fine material washing screw
    January 27, 2014
    GreyStone, which offers a comprehensive line of portable and semi-portable aggregate equipment, is highlighting its new products including the recently released Unibody fine material washing screw. The company says that the Unibody can be set up quickly, and consistently delivers thoroughly-cleaned aggregate, saving time and money. A one-piece body design, fabricated using ASTM A36-certified structural steel, allows the 25ft x 36inch (1m) Unibody to be moved without the need for extra highway permits.
  • Tough tyre from Camso
    October 9, 2019
    Camso’s new MPT 732 tyre is a multi-purpose bias unit designed for high traction, stability and durability under a variety of conditions.
  • Lighter ESCO lip system offer 19% more useable wear metal
    January 6, 2017
    Wear parts specialist ESCO is using Bauma to show its new Nemisys lip system which has been engineered to deliver a lighter weight lip better sized and suited to modern buckets. The lip’s streamlined profile optimises production, says ESCO, and machine working cycles. A clever new hammerless tooth and shroud system helps reduce maintenance costs through improved reliability, faster and safer replacement, and improved lip coverage. The slim lip design and matching tooth system require 10% less force to penet