Skip to main content

Jakarta gets ‘vehicle-free’ streets on Sunday mornings

All motorised vehicles are now barred from entering two of the busiest streets in Indonesian capital Jakarta for five hours every Sunday morning as part of a city-wide bid to cut pollution levels. The ban covering Jalan Sudirman and Jalan Thamrin between 6 am and 11am each Sunday began on Sunday 13 May, 2012.
May 17, 2012 Read time: 1 min
All motorised vehicles are now barred from entering two of the busiest streets in Indonesian capital Jakarta for five hours every Sunday morning as part of a city-wide bid to cut pollution levels.

The ban covering Jalan Sudirman and Jalan Thamrin between 6 am and 11am each Sunday began on Sunday 13 May, 2012.

Related Content

  • Sandvik drilling rigs boost production
    July 9, 2012
    The drill and blast contractor Technical Drilling and Blasting in the United Arab Emirates (UAE) is standardising on Sandvik rock tools for its fleet of drill rigs. The firm operates across Fujeirah, providing quality gabbro aggregates for construction projects in Dubai and Abu Dhabi. Recognised as one of the worlds hardest rocks, gabbro features a typical density in excess of 3tonnes/m, a crushing factor of 10 and a 61% silica content and demand remains strong for this quality construction material. Every
  • Volvo CE unveils L60H, L70H and L90H wheeled loaders
    January 6, 2017
    Volvo Construction Equipment’s new L60H, L70H and L90H wheeled loaders come with efficient Stage IV engines and the Swedish firm’s novel Torque Parallel (TP) linkage. These two key elements are said to allow the H-Series models to deliver outstanding fuel efficiency without compromising on performance.
  • Volvo CE unveils L60H, L70H and L90H wheeled loaders
    February 10, 2015
    Volvo Construction Equipment’s new L60H, L70H and L90H wheeled loaders come with efficient Stage IV engines and the Swedish firm’s novel Torque Parallel (TP) linkage. These two key elements are said to allow the H-Series models to deliver outstanding fuel efficiency without compromising on performance.
  • A slow start for Mexico’s Atizapan-Atlacomulco highway
    June 9, 2015
    Almost one year after work started on Mexico’s Atizapan-Atlacomulco highway, little progress appears to have been made. OHL Mexico, a subsidiary of the Spanish construction firm OHL group -- Obrascon Huarte Lain -- said that the apparent lack of progress is due to the government not having arranged access to the road. Sergio Hidalgo, director general for OHL Mexico, told investors that the land for the first of three stages of the project, covering 25km between Atlacomulco and Ixtlahuaca was released