Skip to main content

Jacobs Engineering Group wins contract to upgrade Scotland’s A9 highway

Jacobs Engineering Group has won the contract to upgrade Scotland’s A9 highway which runs from central Scotland to the far north coast, converting the route into a dual carriageway between Perth and Inverness, one of the busiest sections of the route. Jacobs said that the deal will be “one of the largest road infrastructure projects in Scotland’s history.” This is the second of three design contracts awarded for the project; and it covers 44km of the route including 3km of existing dual carriageway betwee
October 3, 2014 Read time: 2 mins
6726 Jacobs Engineering Group has won the contract to upgrade Scotland’s A9 highway which runs from central Scotland to the far north coast, converting the route into a dual carriageway between Perth and Inverness, one of the busiest sections of the route. Jacobs said that the deal will be “one of the largest road infrastructure projects in Scotland’s history.”

This is the second of three design contracts awarded for the project; and it covers 44km of the route including 3km of existing dual carriageway between the Pass of Birnam and Glen Garry. The Scottish Government estimates the value for each of the three contracts to be £40m to £60m (US$60m to $100m) and the overall construction value for the full 180km-long scheme (of which 124km requires dualling) is estimated at £3 billion ($5 billion).

Under the terms of the contract, Jacobs’ scope of services includes engineering design; statutory procedures; procurement and construction supervision; environmental impact assessment; data management; as well as landowner consultation, and stakeholder and community engagement.

Design principles for the A9 program were developed through the preliminary engineering services commission awarded to Jacobs in September 2012. The project encompasses key features such as crossings over the River Tay, and roadway that runs through National Scenic Areas: the Cairngorm National Park and the Killiecrankie Battlefield.

The entire A9 upgrade scheme is scheduled for completion by 2025.

Related Content

  • Mott MacDonald Grontmij is handling key improvement scheme in UK
    May 16, 2013
    The Mott MacDonald Grontmij joint venture is working on plans for a € 189 million (£160 million) upgrade of the A63 Castle Street in the UK city of Hull. The partners were appointed by the Highways Agency to develop proposals for the scheme, which is intended to reduce journey times to the Port of Hull, ease congestion and improve safety on the city centre section of the A63. The route is currently one of the busiest sections of road in East Yorkshire. This 1.5km dual carriageway runs in an east-west direct
  • Carmacks wins Grande Prairie upgrade
    June 8, 2021
    Work will start soon to widen Highway 40 in and around the northern city of Grande Prairie in Canada's Alberta province.
  • Far from formulaic
    January 4, 2013
    Formwork solutions for the first axial suspension cable stayed bridge in India; and a four-lane road bridge in Germany’s Harz Mountains, are among the latest bridge-based formwork projects analysed by Guy Woodford. RMD Kwikform India has won the contract to design and supply shoring and formwork solutions for the first axial suspension cable stayed bridge ever built in India. The Kota Bridge’s innovative design sees a single 350m span cross the entire width of the Chambal River, with three approach spans on
  • Jacobs wins advisor role from Highways England
    September 3, 2020
    Jacobs has won a key advisor role from Highways England.