Skip to main content

ITS Moscow selects SmartSensor HD to help combat congestion

Radar traffic detection and monitoring specialist Wavetronix has announced the selection of SmartSensor HD for an ambitious ITS project in Moscow, Russia. The project seeks to address some of the heaviest traffic congestion in the world, and is one of the largest projects to deploy SmartSensor HD in Wavetronix' 10-year history.To date, 1,241 SmartSensor HD units have been purchased and are being installed along Moscow roads as part of the ITS Moscow project. SmartSensor HD uses true high definition radar to
May 1, 2012 Read time: 3 mins
Radar traffic detection and monitoring specialist Wavetronix has announced the selection of SmartSensor HD for an ambitious 3278 ITS project in Moscow, Russia.  The project seeks to address some of the heaviest traffic congestion in the world, and is one of the largest projects to deploy SmartSensor HD in Wavetronix’ 10-year history.

To date, 1,241 SmartSensor HD units have been purchased and are being installed along Moscow roads as part of the ITS Moscow project. SmartSensor HD uses true high definition radar to track vehicles in multiple lanes and provides accurate volume, occupancy and speed data. Wavetronix says that currently, it offers the greatest resolution and range for radar vehicle detections, and it is the only device of its kind capable of detecting individual vehicle speeds.

Moscow’s traffic problems are legendary. The city is surrounded by a series of ring roads that carry an average of 700,000 vehicles into the capital each day.  Congestion peaks between 9:00 and 11:00am and between 5:00 and 7:00pm, but delays can last much longer.

“One day it took me more than four hours to drive three miles through the center of Moscow,” says Sergey Strizhenov of the purchase and logistics department at Stroy Invest, an equipment supplier that was instrumental in selecting SmartSensor HD for this project.  “The number of cars in Moscow greatly exceeds the traffic capacity of our roads, and we have huge traffic jams every day as a result.”

Improving traffic conditions is a priority for Moscow Mayor Sergey Sobyanin, but the scope of the problem has reached the national level.  n 2010, Russian President Dmitry Medvedev mandated the creation of ITS Moscow, a joint project between the federal government and city officials aimed at fighting Moscow traffic jams.  Approximately $860 million USD is planned for investment in ITS as part of the project, which is expected to last through 2015.

The installation of SmartSensor HD marks an important first step in bringing Russia’s ITS program to life.  “The sensors are installing right now, and all of them should be installed by the time we announce this project at 254 ITS World Congress in Orlando,” says Strizhenov.  “The sensors are scheduled to be fully operational by December.”

The data collected from SmartSensor HD will be used to monitor traffic, identify problems and inform the public of problems that may affect their commute.  SmartSensor HD was tested extensively prior to being selected as the traffic detection device for ITS Moscow.  “It proved to be the best sensor for this project,” says Strizhenov.  “The accuracy and reliability of SmartSensor HD best fit the needs of Stroy Invest and ITS Moscow.”

For more information on companies in this article

Related Content

  • Plans in hand for Russia’s Silk Road stretch
    September 30, 2015
    Planning is in hand for the construction of Russia’s Silk Route's section. The Silk Road project is intended to connect China with Europe by road. The stretch in Russia will link Moscow’s Central Ring Road to Kazakhstan. The cost of this stretch of the road project estimated at around US$11.8 billion. The route will run from Europe to Western China and will be 8,500km long in all, of which 2,189km will run through Russian territory. The total spending on the construction of the whole length of the road is e
  • Major road plans are being set for Russia’s two key cities
    May 14, 2012
    Targets are being set for road investment, construction and repairs in Russia. To meet the country’s infrastructure needs, Russia’s National Association of Builders estimates that some 1,500km of roads must be built/year. Meanwhile the highway authorities in Moscow are aiming to repair around 33% of the city’s road surface every year. Some 23.6 million m2 of road surface will be repaired in Moscow during 2012, compared with 24.7 million m2 in 2011.
  • Michigan introducing carpooling lanes
    October 24, 2023
    Michigan is introducing carpooling lanes.
  • India’s longest road tunnel continues apace with Atlas Copco support
    May 20, 2014
    The challenging construction of India’s largest road tunnel is part of a vital US$500 million project aiming to connect the isolated northern state of Jammu and Kashmir with the rest of the vast and highly populated country. Guy Woodford reports Travelling on National Highway 1A (NH 1A) in northern India should be the dictionary definition of ordeal. The single lane, narrow and winding road crosses some of the steepest, most treacherous terrain on the planet. The arduous route becomes especially difficult t