Skip to main content

It's a Boneh Bridge

Solel Boneh International (SB) has won a US$210million contract to build a 2.1km bridge over Benue River in Nigeria. Besides the bridge, the Israeli company will also build 22km of access roads for a four-lane dual carriageway in the eastern part of the West African country. The project is expected to take three years to complete. Solel Boneh is the overseas contracting arm of Shikun u'Binui Holdings.
April 26, 2012 Read time: 1 min
1572 Solel Boneh International (SB) has won a US$210million contract to build a 2.1km bridge over Benue River in Nigeria. Besides the bridge, the Israeli company will also build 22km of access roads for a four-lane dual carriageway in the eastern part of the West African country. The project is expected to take three years to complete. Solel Boneh is the overseas contracting arm of 5304 Shikun u'Binui Holdings.

For more information on companies in this article

Related Content

  • Innovative, flexible bridge formwork systems
    February 14, 2012
    Innovative formwork systems have been used to construct a variety of bridge structures. Patrick Smith reports. As part of the work on Germany's new A4 autobahn near Eisenach, the contracting joint venture awarded the formwork contract for two of the three viaducts to Doka. What makes this assignment so special to the company is that although the two steel composite bridges each have very different cross-sections, the JV is using the same overslung composite forming carriage to pour the carriageway slabs of
  • Major Canadian toll road extension project awarded
    May 25, 2012
    A joint venture formed by SNC Lavalin and Cintra Infrastructure will handle the contract to extend Highway 407 in Canada. This US$974.4 million (C$1 billion) deal was awarded by the authorities in Ontario to a joint-venture called the 407 East Development Group General Partnership and is a partnership between Spanish firm Cintra (a subsidiary of Ferrovial) and Canadian company SNC-Lavalin of Canada. The partnership will build, design and maintain Phase 1 of the new Highway 407 East. The construction work is
  • Severn Bridges deal for Amey
    December 3, 2020
    Amey Transport Infrastructure is handling maintenance for the Severn Bridges in the UK.
  • Montreal’s Champlain Bridge superstructure deal signed with Canam-Bridge
    May 22, 2015
    Canada-based Canam-Bridge has been chosen to fabricate the superstructure for the Champlain bridge project in Montreal as well as to supply steel. Marc Dutil, chief executive of Canam, a specialist bridge superstructure fabricator, expects at least 45,000tonnes of steel will be required for the 3.4km bridge that will span the St. Lawrence River which leads to the Great Lakes of North America. The contract is expected to be completed after a formal deal is reached between the SNC-Lavalin consortium con