Skip to main content

Israel’s National Roads Company (INRC) set out programme of road tenders for 2012

The Israel National Roads Company (INRC) has developed an action plan with record levels of spending for 2012. The INRC is publishing tenders for projects this year worth a total of US$942.65 million. The INRC will publish some 36 tenders in 2012, roughly three/month. Among the list of key projects are scheduled work on Road No.1, including the Harel tunnel and Motza Bridge, as well as Roads 531, Road 4 (Morasha), Road 9, Road 31 and Road 38. Forming part of the Netivei Israel plan, a tender for the constru
April 4, 2012 Read time: 2 mins
The 2602 Israel National Roads Company (INRC) has developed an action plan with record levels of spending for 2012. The INRC is publishing tenders for projects this year worth a total of US$942.65 million. The INRC will publish some 36 tenders in 2012, roughly three/month. Among the list of key projects are scheduled work on Road No.1, including the Harel tunnel and Motza Bridge, as well as Roads 531, Road 4 (Morasha), Road 9, Road 31 and Road 38. Forming part of the Netivei Israel plan, a tender for the construction of the road segment between Kefar Yassif and Bar Lev is being published.

The INRC has also started working on updating its guidelines on interchanges geometric design. It is looking to the road industry to provide it with details on related geometric design guidelines of interchanges. These include interchange spacing, entry and exit areas, weaving areas and the design of ramps and auxiliary lanes (acceleration and deceleration lanes). The INRC is also looking for information on interchange types including system interchanges, service interchanges (grade separated junctions), and compact grade separated junctions, and warrants for interchanges and junctions.

Additional topics the INRC is looking for material on include; access to infrastructure from the interchange area, the usage of interchange delineated areas and access solutions and optimal suitability of the available right of way to the traffic needs and the interchange selection and design. It is also looking for information on incorporating public transportation components including bus stops, cyclists' infrastructure and pedestrian needs in interchange design, and sign position and information clarity for drivers.

Related Content

  • Underground routes for highways
    July 20, 2012
    Increasingly, and where possible, roads are being built in tunnels often for environmental reasons, writes Patrick Smith As part of the new M7 motorway development in the southwest of Ireland, the four-lane route crosses the River Shannon near Limerick, before it flows into the Atlantic. Centrepiece of the 10km long Limerick Southern Ring Road is the required tunnelling (675m long), which including the north and south entrance and exit ramps, means it will be 915m long. Completion of the work is planned for
  • New barrier, crash cushion and access control technology will benefit road user safety
    October 26, 2012
    Protecting road users, with barriers, crash cushions or access control systems, is crucial for network safety - Mike Woof writes Tough regulations are now in place in Europe and the US, requiring road authorities to provide safer road infrastructure than in the past. Technologies to reduce the severity of vehicle impacts against obstructions or redirect vehicles into the roadway should help cut injuries amongst drivers and passengers alike. The specifications for the use of crash cushions and barriers can v
  • Tenders received for Mersey Gateway project
    April 10, 2013
    Tenders have now been received for the Mersey Gateway Project from all three shortlisted bidders competing to deliver the project on behalf of Halton Borough Council. The full and final tenders were delivered to the project’s offices overlooking the River Mersey ahead of the deadline. The project team and its expert advisors will now spend the next few weeks assessing the three bids. The bidding teams have spent the last 18 months working on their plans to become Halton Borough Council’s private sector par
  • Easing temporary highway danger
    February 22, 2013
    Some of the latest speedometer technology has been successfully trialled in French highway work zones, while tireless work continues across Europe and the United States to reduce the number of work zone deaths and serious injuries involving road workers and motorists. Guy Woodford reports The number of roadworkers being killed and seriously injured on England’s motorways and major trunk roads more than doubled between 2007 and 2010 – from no deaths and 14 serious injuries. This rise has led to to major camp