Skip to main content

IRF Supports Capacity Building for Performance-Based Road Contracts

For 10 days in October, more than 40 highway engineering professionals from 14 different countries congregated in Orlando, Florida, USA. With lecturers from The Netherlands, Finland, New Zealand, Canada and the US the group discussed the specifics about how to effectively write, implement and enforce performance-based contracts.
December 23, 2014 Read time: 2 mins

For 10 days in October, more than 40 highway engineering professionals from 14 different countries congregated in Orlando, Florida, USA. With lecturers from The Netherlands, Finland, New Zealand, Canada and the US the group discussed the specifics about how to effectively write, implement and enforce performance-based contracts.

The level of sophistication of these types of contracts vary around the world; some construction and maintenance contracts have been in force for over a decade, while other regions have yet to plan their first contract. The International Road Federation (IRF) brings together these individuals to share innovative ideas, discuss case studies and learn the best techniques to help ensure success.

Case studies from Brazil and Argentina served as models for agencies in attendance.

Attendees were able to appreciate the challenges in relating with contractors as well as setting benchmarks for evaluation and considering risk in project implementation.
In addition World Bank officials stressed the need for both owners and contractors to have the needed technical know-how for PBC contracts to be successful. Building local capacity is essential in this regard.

The United States Federal Highway Administration provided some detailed insight into fraud and corruption, including how to boost awareness and education among the general public in affected regions.

Writing a performance-based contract effectively requires that both the contractor and asset owner become partners. Participating in discussions led by private contractors helped the attendees of this course see both sides of the contract and attain good understanding of the essentials of sharing risk.

For more details on this course and other IRF Training Events, visit %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal https://www.irfnews.org/trainingV IRF Washington training website false http://www.irfnews.org/trainingV false false%>

Related Content

  • CONEXPO-CON/AGG 2017 record for education sessions
    September 9, 2016
    The CONEXPO-CON/AGG 2017 construction/quarrying machinery exhibition will offer a record 143 education sessions across 10 tracks. This will include a new Technology track, to provide attendees with the latest industry knowledge and best practices to improve professional skills and company productivity.
  • Building Tomorrow’s Transport Infrastructure Today – IRF Global in Washington
    May 2, 2018
    Preparations are underway for the world’s leading road, tunnel and bridge exhibition Produced by the International Road Federation, the IRF Global Road2Tunnel Expo & Conference is the only international conference and tradeshow of its kind dedicated to road, tunnel and bridge construction. “Technology and innovations are evolving at a pace never seen before in the history of the road and transport sector” noted IRF president & CEO C Patrick Sankey. “From innovations in materials, such as self-healing con
  • ITF Summit 2016 Awards to recognise outstanding achievements
    March 7, 2016
    Transport operators, manufacturers and researchers will be honoured at the International Transport Forum Awards in the presence of transport ministers from around the world at the ITF’s Annual Summit on 18-20 May in Leipzig, Germany. The ITF will award prizes in three categories: Transport Achievement Award: Recognises a demonstrated achievement of excellence in transport provision.
  • Double delight for Powerscreen and DUO in Ghana
    January 6, 2017
    Powerscreen has signed DUO Africa as its first distributor in Ghana. And, as the ink dried on the contract at bauma, the company unveiled a deal to supply three crushing and screening trains. DUO Africa will sell equipment into Ghana and support Powerscreen products in the sub-Saharan region. Among its first contracts is to supply two Powerscreen XA400 primary jaw crushers, two 1000 Maxtrak cone crushers and two Chieftain 2100 triple-deck screens to UK-based Hawk Plant for a number of aggregate crushing ope