Skip to main content

Ireland's budgert cuts impact on road projects

Ireland’s government is undergoing a period of belt-tightening, with a string of budget cuts that will directly impact on the transport sector. The country was in the process of spending heavily on its infrastructure but with the tough economic climate it is now facing, a number of road projects are among those facing the axe. The Irish government is slashing its infrastructure spending from €39.6 billion to €22.9 billion between now and 2013. This looks likely to result in 40 road projects, including hig
May 14, 2012 Read time: 2 mins
RSSIreland’s government is undergoing a period of belt-tightening, with a string of budget cuts that will directly impact on the transport sector.

The country was in the process of spending heavily on its infrastructure but with the tough economic climate it is now facing, a number of road projects are among those facing the axe.

The Irish government is slashing its infrastructure spending from €39.6 billion to €22.9 billion between now and 2013. This looks likely to result in 40 road projects, including highways and dual carriageways, being shelved or cancelled.

Ireland’s 5525 National Roads Authority (NRA) has been told not to build previously planned rest areas along highways, with the
Atlantic Corridor Road linking Letterkenny and Waterford one of only a few projects that will remain in hand.
However, the NRA is planning the M20 motorway that will link the cities of Limerick and Cork.

Planning permission is being sought at present for the 80km road, which will be built in two phases: the first stage will run for around 40km from Kileens to Velvetstown while the second phase runs from Buttevant to Attyfield.

The project is expected to cost €800 million and the NRA hopes to begin construction of the first phase of the road in 2012, assuming that approval and funding can be secured.

Work on the second stage would start after the completion of the first phase in 2015, with the project planned for a completion date in 2018. However, with Ireland’s slow down on its infrastructure investment at present following the financial crisis it is not clear if the M20 project will be delayed.

For more information on companies in this article

Related Content

  • Serbia reduces cost of highway construction
    March 22, 2012
    Serbia has managed to reduce the cost of building the Corridor 10 highway by €80 million. These funds will instead be used to pay for upgrades and improvements needed for the second section of the highway project, close to Neradovci. So far some 180km of the Corridor 10 highway has been built over a 40 month time frame. A further 150km of the highway has still to be built. Work on the Corridor 10 motorway is also being financed by the European Bank for Reconstruction and Development and the state budget.
  • Waterford bascule bridge delivery
    May 22, 2025
    Components for Waterford’s bascule bridge are being delivered.
  • Cost reductions on Russian highways
    July 12, 2012
    Major cost reductions are being seen on some key highway projects in Russia including the new ring road project in St Petersburg, where the reduction is US$192.31 million. The management of the ring road in St Petersburg has signed an agreement with the main contractors (Flora, the corporation Inzhtransstroy) to cut costs by 12-17.6% in 2009-2010. The 12% reduction is equivalent to US$32.05 million and will apply to contractors that are to complete facilities in 2009. Meanwhile the 17.6% cut is for work pla
  • Ireland signs winter road maintenance package
    October 21, 2013
    Vaisala with Ireland’s National Roads Authority (NRA) has signed a €3.65 million agreement with Vaisala. The five-year contract will see Vaisala providing a comprehensive package of winter maintenance decision making tools, solutions and services. This will allow the NRA to optimise winter service to Irish road users. The deal involves a state of the art road weather information management system. The contract includes maintenance of over 80 weather stations across Ireland as well as a provision for expandi