Skip to main content

Ireland's budgert cuts impact on road projects

Ireland’s government is undergoing a period of belt-tightening, with a string of budget cuts that will directly impact on the transport sector. The country was in the process of spending heavily on its infrastructure but with the tough economic climate it is now facing, a number of road projects are among those facing the axe. The Irish government is slashing its infrastructure spending from €39.6 billion to €22.9 billion between now and 2013. This looks likely to result in 40 road projects, including hig
May 14, 2012 Read time: 2 mins
RSSIreland’s government is undergoing a period of belt-tightening, with a string of budget cuts that will directly impact on the transport sector.

The country was in the process of spending heavily on its infrastructure but with the tough economic climate it is now facing, a number of road projects are among those facing the axe.

The Irish government is slashing its infrastructure spending from €39.6 billion to €22.9 billion between now and 2013. This looks likely to result in 40 road projects, including highways and dual carriageways, being shelved or cancelled.

Ireland’s 5525 National Roads Authority (NRA) has been told not to build previously planned rest areas along highways, with the
Atlantic Corridor Road linking Letterkenny and Waterford one of only a few projects that will remain in hand.
However, the NRA is planning the M20 motorway that will link the cities of Limerick and Cork.

Planning permission is being sought at present for the 80km road, which will be built in two phases: the first stage will run for around 40km from Kileens to Velvetstown while the second phase runs from Buttevant to Attyfield.

The project is expected to cost €800 million and the NRA hopes to begin construction of the first phase of the road in 2012, assuming that approval and funding can be secured.

Work on the second stage would start after the completion of the first phase in 2015, with the project planned for a completion date in 2018. However, with Ireland’s slow down on its infrastructure investment at present following the financial crisis it is not clear if the M20 project will be delayed.

For more information on companies in this article

Related Content

  • Major highway growth in Portugal
    April 12, 2012
    Twenty years ago Portugal was bottom of the European league in terms of roads and safety. A series of ambitious plans has seen the country rise to the top. Patrick Smith reports on how this was achieved In Portugal, out of 3,600km of main national roads (IP+IC), some 1,500km of motorways/high-capacity routes are financed under public-private partnership (PPP) agreements. These are tolled either using shadow tolls (these are being phased out) or real tolls, and plans are in hand to make routes multi free-fl
  • ALARM Survey: UK maintenance backlog continues despite funding boost
    March 23, 2016
    Highways departments in England and Wales have yet to feel the benefit of the UK government’s commitment to spend €7.6 billion (£6 billion) on local road maintenance between 2015 and 2021. In fact, overall road budgets have dropped by 16%, according to the annual Local Authority Road Maintenance (ALARM) survey of highway bosses in England and Wales, conducted by the Asphalt Industry Alliance. This is reflected in the increase in average budget shortfalls – the difference between the money needed to ma
  • Kenya develops annuity road funding model
    May 8, 2015
    Kenya is introducing novel methods for funding its necessary road infrastructure development - Shem Oirere writes. Kenya has unveiled a new financing model for road construction and reviewed its design standards and construction methodologies, which forms part of a new strategy for the East African country. Under this new plan Kenya is planning to upgrade 10,000km of road, with these links featuring asphalt surfacing; the work being carried out over the next five years at a cost of US$2.8 billion. Despite t
  • Fierce competition for Toronto 407 ETR highway expansion contract
    April 24, 2014
    ACS of Spain and Ferrovial are competing for the contract to construct and exploit the second phase of expanding the 407 ETR highway in Toronto, Canada – one of the world’s biggest toll highways. Ferrovial has been managing the 407 ETR highway since 1999 and secured the first phase of its expansion. Currently, ACS and Ferrovial lead two of the three groups invited to present bids for the second phase of the expansion. The third group is headed by Canada's SNC Lavalin, which is Ferrovial's current partner i