Skip to main content

Invias to invest US$247.62mn in Colombian road infrastructure in 2013

Colombia’s road administration body Instituto Nacional de Vias (Invias) will carry out investments of around US$247.62 million (COP 455bn) in infrastructure projects in 2013. Some of the Invias projects include the construction of several roads, such as Tumaco-Pasto-Mocoa, with an investment of $40.81 million (COP 75bn), San Miguel-Santana with an investment of $16.32 million (COP 30bn), and Popayan-La Plata, at a cost of $10.88 million (COP 20bn). Furthermore, Invias will also invest $69.66 million (COP 12
April 24, 2013 Read time: 1 min
Colombia’s road administration body Instituto Nacional de Vias (2812 Invias) will carry out investments of around US$247.62 million (COP 455bn) in infrastructure projects in 2013.

Some of the Invias projects include the construction of several roads, such as Tumaco-Pasto-Mocoa, with an investment of $40.81 million (COP 75bn), San Miguel-Santana with an investment of $16.32 million (COP 30bn), and Popayan-La Plata, at a cost of $10.88 million (COP 20bn). Furthermore, Invias will also invest $69.66 million (COP 128bn) in road maintenance projects.

For more information on companies in this article

Related Content

  • Eiffage to revamp Paris ring road interchange at Quai d'Ivry
    June 19, 2015
    Eiffage has won a contract to restructure the Quai d’Ivry interchange on the Paris ring road. Eiffage’s Public Works division picked up the €48 million deal within Paris’s 13th arrondissement. The 40-month contract was awarded by Paris’s development agency SEMAPA -- Société d’Etude, de Maitrise d’Ouvrage et d’Aménagement Parisienne. Eiffage said in a statement that the contract involves “every area of expertise offered by the Public Works division, including civil engineering, steel construction an
  • funding runs out for Spanish road project
    May 18, 2012
    The Spanish Ministry of Works requires further funds to complete work on the 261.5km A-11 Duero Highway. A further €1.13 billion is needed to pay for the work on the stretch between Los Rabanos (Soria) and San Martin del Predroso (Zamora) on the border with Portugal. There has already been €54.2 million invested in the project, which paid for construction of the 15.2km of the Aranda de Duero bypass but work is currently at a standstill. No new work has been carried out since July 2010 when the 6.2km Ronda N
  • Philippines: Laguna Expressway and Dike Project fails to get bids
    March 30, 2016
    Construction of a major 47km highway and sea protection dike development in Manila has been thrown into doubt after no bids were received for the US$2.65 billion contract. Philippines media report that the Department of Public Works and Highways declared the auction for the six-lane Laguna Expressway Dike Project a failure after the three pre-qualified bidders didn’t submit bids. The pre-qualified consortia were Trident Infrastructure and Development consortium – consisting of SM Prime Holdings, Megaw
  • Volvo CE’s arduous Andes assignment
    August 20, 2013
    Volvo Construction Equipment is working in some of the world’s most treacherous terrain to construct a high-speed road link across the Andes Mountains. A fleet of 60 Volvo Construction Equipment (Volvo CE) road-building machines is being used to construct a 140km highway across the Andes Mountains, from Bucaramanga, Colombia’s eighth largest city, to Cucuta on the border – providing the country with a much-needed high-speed link with Venezuela. Tasked with this huge undertaking is innovative Colombian hi