Skip to main content

Investment in Indonesia

The authorities in Indonesia are planning six toll road projects to link with capital Jakarta. These have a total value of US$4.52 billion and include the 18km Semanan-Sunter toll road, a 10km road linking Kampung Melayu and Kemayoran, the 9.6km Pasar Minggu-Casablanca road and the Ulujami-Tanah Abang road. Prequalification for tendering will commence once full approval has been given for the projects to become part of Jakarta’s 2011-2030 infrastructure programme. Also in Indonesia, Jasa Marga is investing
May 22, 2012 Read time: 1 min
RSSThe authorities in Indonesia are planning six toll road projects to link with capital Jakarta. These have a total value of US$4.52 billion and include the 18km Semanan-Sunter toll road, a 10km road linking Kampung Melayu and Kemayoran, the 9.6km Pasar Minggu-Casablanca road and the Ulujami-Tanah Abang road. Prequalification for tendering will commence once full approval has been given for the projects to become part of Jakarta’s 2011-2030 infrastructure programme.

Also in Indonesia, 1083 Jasa Marga is investing $2.83 billion in developing close to 250km of toll road projects, which are due for completion in 2014. The roads will be open to traffic in 2015.

For more information on companies in this article

Related Content

  • Indonesia’s Trans Marga Jateng secures key new toll road loan
    April 8, 2014
    A US$415.45 million (IDR 4.7 trillion) loan has been agreed for a new 75.67km toll road as part of the Trans Java toll road project in Indonesia. Trans Marga Jateng, the 60:40 joint venture of Indonesian state-owned toll-road operator Jasa Marga and Central Java's state-owned infrastructure firm Sarana Pembangunan Jawa Tengah, has secured the 15-year syndicated loan from a group of lenders headed by state-owned bank Bank Mandiri. The new toll road will run from Solo to Semarang through Salatiga and Boyola
  • Multi-million dollar investment in Indonesian road toll projects
    July 12, 2012
    Millions of US dollars are being poured into new and expanding toll road projects in Indonesia. Wijaya Karya (Wika), the Indonesian government-owned construction service provider, will build toll roads linking Kedung Badak to Kedung Halang and Pandaan to Gempol in Bogor through two contracts worth US$36.35million (IDR 340.80bn) and US$23.98million (IDR 225bn), respectively. Awarded by highways operator Jasa Marga (JSMR), the contracts require the roads completion in 18 months.
  • Jasa Marga picks up a loan for the Medan-Kualanamu project
    April 27, 2015
    In Indonesia, state-controlled toll road operator Jasa Marga has secured a loan worth nearly US$124 million to finance its Medan-Kualanamu-Tebing Tinggi (MKTT) toll road project. The loan is secured from a consortium of banks that include Bank BRI, Bank Mandiri and Bank BNI. The total cost of the project is around $315 million. The tender process of the project is being conducted and the winning bidder will be revealed in May. Jasa Marga operates and manages 13 toll road concessions directly and nin
  • Trimble technology could slice a third off the new highway costs in Indonesia’s US$400 billion infrastructure plan
    February 21, 2014
    Cutting-edge Sandvik Construction equipment is said to be giving ambitious Argentinian quarry firm Canteras Amadeo a commercial advantage .Starting life as a one-quarry enterprise in Córdoba, Argentina, in 1999, Canteras Amadeo is a flourishing business with additional operations in Cordoba and Santiago del Estero. Key to its success is said to be its owners’ embrace of technological improvement, and their choice of Sandvik equipment to improve their processes.