Skip to main content

Intermat launch for Liebherr wheeled excavators

2012 sees the start of a new wheeled excavator programme from Liebherr, and the A916 represents the first fruit from the project. Replacing the A316 Litronic, the new A916 has been developed to meet Stage IIIB emissions requirements and has an operating weight from 17-18.1 tonnes depending on specification. Power comes from a four-cylinder 110kW engine with common rail fuel injection, EGR and DOC – a DPF is available as an optional extra for those working inside buildings.
January 6, 2017 Read time: 1 min
Leibherr A916 wheeled excavator live at INTERMAT

2012 sees the start of a new wheeled excavator programme from 718 Liebherr, and the A916 represents the first fruit from the project.

Replacing the A316 Litronic, the new A916 has been developed to meet Stage IIIB emissions requirements and has an operating weight from 17-18.1 tonnes depending on specification.

Power comes from a four-cylinder 110kW engine with common rail fuel injection, EGR and DOC – a DPF is available as an optional extra for those working inside buildings.

With more power than its predecessor, the A916 packs better hill-climbing ability on the road, reducing travel times between job sites. The machine features a larger fuel tank - 360 litres, up from 290 litres – and the use of LED-type white marker lights and red LED tail lights to bring greater durability and reduced service costs to the machine

%$Linker: External 0 0 0 oLinkExternal www.liebherr.com Liebherr false http://www.liebherr.com/ false false%>%$Linker: External 0 0 0 <br /> false http://www.liebherr.com/ true false%>

%$Linker: 2 Internal 2 4824 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/intermat-2012/video/ true false%>

For more information on companies in this article

Related Content

  • AV good alarm
    January 6, 2017
    Amber Valley Developments is staging the European launch of its range of Ecolarm environmentally friendly non-bleeping alarms at Intermat 2012. The models come in a range of decibel levels and with a range of features from night silent to reverse twice mute versions. The LED Seatbelt alarm for off-highway use is designed to be used in conjunction with Amber Valley’s seatbelt system to indicate a seatbelt is being worn by the operator – and thus conforming with health and safety regulations. Another device i
  • AV good alarm
    April 13, 2012
    Amber Valley Developments is staging the European launch of its range of Ecolarm environmentally friendly non-bleeping alarms at Intermat 2012. The models come in a range of decibel levels and with a range of features from night silent to reverse twice mute versions. The LED Seatbelt alarm for off-highway use is designed to be used in conjunction with Amber Valley’s seatbelt system to indicate a seatbelt is being worn by the operator – and thus conforming with health and safety regulations. Another device i
  • Chrono Flex seeks additional partners for hose repair services
    January 6, 2017
    Visitors to the Chrono Flex stand can imagine themselves in either the Sahara or the frozen north. The company has set up a convivial stand, equipped with an ice bar and a Saharan tent to emphasise that even the hottest and coldest places are within reach of its emergency hydraulic hose repair services. Broken hoses can paralyse a construction site, says the company, whose network of technicians operate from mobile workshops and aim to be on site within an hour.
  • Chrono Flex seeks additional partners for hose repair services
    April 18, 2012
    Visitors to the Chrono Flex stand can imagine themselves in either the Sahara or the frozen north. The company has set up a convivial stand, equipped with an ice bar and a Saharan tent to emphasise that even the hottest and coldest places are within reach of its emergency hydraulic hose repair services. Broken hoses can paralyse a construction site, says the company, whose network of technicians operate from mobile workshops and aim to be on site within an hour.